Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Nexans Wins a 104 Million Euro Contract for Statnett’s Oslofjord II Submarine Power Cable Project

Nexans has been awarded a 104 million Euro contract by Statnett, Norway’s state-owned power grid, to design, manufacture and install the new Oslofjord II submarine high-voltage power link to replace the existing cables installed over 30 years ago that have now reached the end of their service-life. The new Nexans cables will help increase transmission capacity to almost 3,000 MVA, as well as ensuring a high level of continuity and reliability for a power link that plays a vital role both in Norway’s transmission grid and in facilitating the transmission of power between Norway and Sweden.

The Oslofjord II link, to be installed over a 13 km route across the sea channel (fjord), will consist of 3 x 420 kV XLPE submarine power cables and 6 x 420 kV paper insulated submarine cables. The XLPE installation will be the largest (longest and most extensive) of its kind in the world, beating the previous length of 2.4 km established by Nexans in the Ormen Lange project.

Nexans will deliver a total of 117 km of 420-kV submarine cable in 9 lengths, including end terminations. Each cable will be 13 km long. The cables are to be manufactured at Nexans’ plants in Norway and Japan and will be installed at a water depth of 200 to 250 meters by Nexans’ own vessel, the C/S Nexans Skagerrak, working in combination with other vessels. The first section of the installation will be completed in 2011, with the final delivery taking place during August 2012.

“Oslofjord II is a very important project for us in the Norwegian market. We have worked with Statnett on numerous occasions and are both proud and pleased that they have placed their trust in us once again”, says Krister Granlie, Nexans Managing Director Umbilicals & Submarine High Voltage Business Group.

The existing Oslofjord cables, based on an oil-filled design, were manufactured and installed by Nexans in a series of projects between 1959 and 1980.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues