Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Prysmian Secures SYLWIN1 Wind Farm Project by Tennet for the Cable Connections to the German Power Grid

Prysmian has been awarded a project worth more than €250 million by the Dutch-German grid operator TenneT for the connection project SylWin1, linking offshore wind farms in the North Sea to mainland Germany.

Prysmian will provide complete supply, installation and commissioning of submarine and land cable connections as part of a larger contract awarded to the consortium of Prysmian and Siemens Energy. Siemens will deliver the Voltage Sourced Converter (VSC) system, with a rating of 864 MW. The turnkey connection will link the offshore wind park DanTysk, located about 160 km offshore, to the mainland with the purpose of transmitting power from renewable source into the German Grid.

The SylWin1 project follows the BorWin2 and HelWin1 projects awarded last year and it will exceed the milestones set by BorWin2. The project involves a longer DC cable connection and is the highest ever rated system for VSC technology with a power rating of 864 MW operating at the highest commercially available voltage level of ± 320 kV DC. The SylWin1 project will use extruded HVDC cable technology from Prysmian together with Siemens HVDC Plus® converter technology at the offshore platform and onshore stations. The interconnection comprises of HVDC subsea and land cable types at a voltage of ± 320 kV DC to be supplied by Prysmian along a 159 km sea route passing to the east of Helgoland and continuing along a 45 km land route to the land converter station in Büttel, north-west of Hamburg. Extruded 155 kV HVAC submarine cable connections will complete the connections from the DanTysk offshore wind park transformer platform to the offshore converter platform. The cable system’s configuration comprises also of a fibre optic cable for signalling and communication purposes.

The cables and accessories will be manufactured from 2012 onwards at Prysmian’s uropean HV factories.

Installation activities will commence in 2012 and continue into 2013. The commencement of commercial operation of the HVDC link is planned for 2014.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues