Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

PSE&G Contracts for High-Voltage Gas-Insulated Substation to Increase Electric System Reliability in the State of New Jersey

Siemens has been awarded a contract by New Jersey-based Public Service Electric and Gas Co. (PSE&G), one of the largest electric utilities in the U.S., for the design, engineering, manufacturing, installation, testing and commissioning of an indoor 230-kV, 4000-A, 80-kA gas-insulated substation (GIS) and associated gas-insulated bus (GIB). The GIS is an expansion of the existing Bergen switching station located in Ridgefield, New Jersey. The new infrastructure will help provide additional load capability and enhanced system reliability all in a small footprint. Commissioning of the substation is scheduled in stages beginning at the end of 2012 through April 2013.

"Siemens is pleased to partner with PSE&G on increasing transmission reliability to its customers in New Jersey," said Frank Petraglia, Vice President and General Manager of the High-voltage Substations business of Siemens Energy, Inc. "The compact design of the substation, coupled with minimal maintenance requirements, ensures a long service life for PSE&G." PSE&G previously contracted with Siemens for three 550-kV gas-insulated substations, one of which will begin operation in 2012.

The Siemens scope of supply includes the design, engineering, installation, testing and commissioning of the GIS and associated control and protection buildings, as well as the GIS breakers in a breaker-and-a-half arrangement. The GIS technology allows construction of a substation in a significantly reduced space compared to conventional air-insulated substations (AIS). GIS is also considered a more reliable solution with very limited maintenance and less sensitivity to potential external environmental factors. It is equipped with a state-of-the-art gas density monitoring system in order to continuously monitor SF6 density. The system's partial discharge sensors also predict potential partial discharge in the system, alerting the utility in advance of an irregularity that might trigger a maintenance operation.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues