Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Community Invited to Comment on Draft EIS for Key New Queensland Powerline Project

Landowners, community members and interested stakeholders have been invited to comment on the Draft Environmental Impact Statement (EIS) for Powerlink Queensland’s proposed transmission line between Springdale (near Gatton) and Blackwall (near Ipswich).

Powerlink Chief Operating Officer, Simon Bartlett, said the proposed Springdale to Blackwall 500-kV transmission line was essential infrastructure which had been identified for a number of years in the South East Queensland Infrastructure Plan and Program. He said the new line was needed to efficiently and reliably meet future electricity demand in South East Queensland.

“The Springdale to Blackwall transmission line is planned to be built almost exclusively on existing easements acquired for this purpose in the early to mid 1990s,” Bartlett said.

Bartlett advised that specialist environmental consultant Parsons Brinckerhoff (PB) had been engaged to undertake a comprehensive Environmental Impact Assessment (EIA) for the project to ensure that any potential environmental, social and economic impacts were identified and managed. “As part of this process, PB has been undertaking field research, investigations and consultation to produce a Draft EIS report, which is now available for comment,” Bartlett said.

“The report confirms that the existing easements are the most appropriate location for the new line. A minor deviation of the alignment (for one short 500-m section) is proposed in Muirlea, and this will also be predominantly on existing electricity easements. “The report also concludes that, provided Powerlink implements the recommendations outlined in the Draft EIS and associated Draft Environmental Management Plan (EMP), there do not appear to be any social, environmental or economic factors that would prevent the project from proceeding.

“We encourage anyone with an interest in the project to review and make a submission on the Draft EIS report. Once the public comment period has concluded PB will review, consider and address all submissions received. These submissions, and responses provided to submitters, will be included in the Final EIS which is expected to be released in late 2010,” he said.

Bartlett said the Draft EIS would be available for comment for just under a six-week period until Thursday 23 September 2010, which is nearly double the standard submission period under the Sustainable Planning Act 2009.

“This extended timeframe is being provided in light of PB’s release of the Draft EIS for ENERGEX’s Abermain to Lockrose 110-kV powerline upgrade project around the same period. About half of these ENERGEX easements run parallel to Powerlink’s Springdale to Blackwall easements in the area,” he said.

Copies of the Springdale to Blackwall Draft EIS are available online at PB or Powerlink’s websites (www.pb.com.au/springdaleblackwall or http://www.powerlink.com.au/ - go to ‘Projects in My Area/Southern’).

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues