Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

SGCC Jinping-Sunan ±800kV UHV DC Transmission Project Progresses Smoothly

For the timely power delivery from the three hydropower stations, The State Grid corporation of china (SGCC) has planned to carry out the Jinping-Sunan Project, Jinping Power Group 500-kV AC Output Project, and Tongli Converter Station’s AC Interconnection Project. " In order to ensure the timely delivery of the power from the hydropower station in Guandi and Jinping and alleviate the power shortage effectively in Eastern China, we will further clarify the objective of Jinping- Sunan ±800-kV UHV DC Transmission Project to ensure its bipolar operation in 2012." Vice Executive President Zhen Baosen stated during a construction meeting in Yulong Converter Station in Xichang, Sichuan, where the project started.

The Jinping-Sunan Project is another UHV DC transmission project after the Xiangjiaba-Shanghai UHV DC Transmission Demonstration Project. The Jinping-Sunan project starts at Yulong Convertor Station in Xichang City. The 2089-km power line has a transmission capacity of 7.2 GW, picking its way through Sichuan, Yunnan, Chongqing, Hunan, Hubei, Anhui and Zhejiang towards Jiangsu. It is the DC project with the highest voltage, highest capacity and longest transmission distance. The Jinping Power Group 500-kV AC Output Project has a total investment of 5.7 billion Yuan, including 6 common-tower double circuits and one single circuit, equivalent to 1634 km in single circuit.

Zheng inspected the Yulong station in the rain and approved of the construction. He said Jinping- Sunan Project was a new stage for SGCC in UHV DC construction, a project for constructors to obtain progress following the spirit of “In Search of Excellence, in Pursuit of Out-performance.” The Jinping-Sunan Project has a higher domestication level than the Xiangjiaba-Shanghai Project. Currently, the project has entered a critical phase, which requires every department to enhance on-site coordination, emphasize quality and technology innovation, implement necessary security measures, keep a positive team spirit and speed up the overall operation progress. He stressed that in the light of the power shortage in East China next year, all departments should fully comprehend the project’s importance and the characteristics, placing it in an important position. Emphasis should be attached to the following: first, relevant units should coordinate the converter’s civil construction, line, auxiliary projects, design and equipment according to the new milestone plan; second, all departments should strengthen organization and leadership, establish regular coordination system, and work out detailed implementation plans for different tasks; third, great attention should be paid to production safety to ensure safety and quality, lessons should be learned from recent accidents, and safety measures are to be implemented in all aspects to achieve excellence.

Deputy Chief Engineer Li Wenyi, relevant departments from the Headquarters, DC Construction Branch, Sichuan Electric Power Company, and companies responsible for project supervision, design and equipment production attended the meeting.

SGCC and Ertan Hydropower Development Co. held a coordination meeting on the same day. Both sides indicated that they will work together to promote the construction of the Jinping-Sunan Project, Jinping Power Group 500-kV AC Output Project, and three output hydropower stations, in order to realize the power delivery of Sichuan hydropower to East China through the Jinping-Sunan Project.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues