Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Shanghai Served by 3M ACCR Conductor in New Installation

Shanghai Electric Power Co. Ltd. has become the first utility outside the United States to install 3M Aluminum Conductor Composite Reinforced (ACCR) light-weight, high-capacity transmission conductor.  3M’s ACCR can carry more than twice the current of conventional steel-core conductors of the same diameter on existing towers, without requiring new construction or rebuilding.

Shanghai Electric, a publicly owned utility whose major shareholders are China Power Investment Corp. and East China Power Development Co., serves the Shanghai metropolitan area, providing more than 2,800 MW of generating capacity.  It deployed 3M’s ACCR to increase capacity on a key 10-mile line to meet growing peak demand.  Shanghai is the largest city in the People’s Republic of China, and the eighth largest metropolis in the world.   

3M’s ACCR is currently in service in the U.S. for Xcel Energy in Minnesota, Arizona Public Service in Phoenix and Western Area Power Administration’s Topac-Davis line along the Colorado River, as well as for several other domestic utilities. 

“Interest from U.S. and foreign utilities continues to gain momentum as decision-makers realize we have a proven and ready solution to common problems that limit the capacity of conventional transmission lines, often causing constraints and bottlenecks,” said Tim Koenig, director of the 3M High Capacity Conductor Program.  Mr. Koenig also noted that, because 3M’s ACCR is installed on existing structures and can match the sag and tension of the existing conductor with less weight, utilities can reduce the costs and risks associated with major transmission construction projects, without adding any risk to the existing system. 

“In addition, 3M has invested in a state-of-the art manufacturing infrastructure to meet the growing demand for alternative solutions to problems afflicting the power grid. Process Design and Control is one of 3M’s 45 core technology platforms.  Plus, 3M’s global presence with operations in nearly 60 countries, enables us to be where our customers are located and provide reliable technologies,” he continued. 

"We hope 3M's ACCR can help us by saving total project cost and increasing line transmission capacity,” said Mr. Pan, Shanghai Power Yanggao project designer. “Based on the October 14 line energizing, it works well, and we are looking forward to running more performance data to prove it in the future three to five months. After passing a real project's running test, we believe 3M's ACCR will have a brilliant future in field application and will help us enhance the city transmission network."

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues