Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Siemens Receives Order to Provide 345-kV GIS Substation in Connecticut

Siemens Energy has recently been awarded a contract by the EPC Contractor O&G Industries, Inc. to provide a turnkey 345-kV GIS substation for the Kleen Energy 620 MW combined cycle power plant in Connecticut. As the only technology company that provides products and solutions along the entire energy conversion chain, Siemens Energy will also provide the major rotating and plant control equipment for this project under separate contracts. The new power plant required the new substation to tie into existing transmission lines. The GIS substation contract is valued at more than USD26 million.

Siemens will provide five bays of its 8DQ1 345-kV gas insulated switchgear manufactured in Germany. Under this contract, Siemens Energy will engineer, procure and construct the substation, while civil services will be engineered and executed by O&G. The substation is expected to be completed in November 2009 and is expected to be on line 2-3 weeks thereafter.

O&G Industries Vice President Walt Koziol stated, “We chose Siemens because of their extensive GIS experience and local labor knowledge. Couple this with our positive ongoing relationship with them in building the generation facility, we feel comfortable with their ability to execute this project.”

In 2008, Siemens was awarded a contract to supply two SGT6-5000F gas turbines with a nominal capacity of 200 MW each and one SST6-5000F steam turbine (275MW) for the 620-MW combined cycle power plant in Middletown, Connecticut. The turbines are expected to be delivered to the customer site in the first half of 2009. The plant will provide sufficient power to supply approximately 275,000 households with electricity.

“Siemens is the only supplier in the industry to provide a complete portfolio of products and services across the entire energy conversion chain from oil and gas to generation, transmission, and distribution, as well as the end energy consumer, ” said Dave Pacyna, Senior Vice President & General Manager of Siemens Energy, Inc.’s North American Transmission and Distribution Divisions. “The award of the new combined cycle power plant and subsequent transmission substation illustrate Siemens’ ability to provide turnkey services to meet the needs of energy providers throughout the energy value chain.”

Siemens’ high voltage gas insulated switchgear features a very small footprint as compared to conventional air insulated switchgear, so it is particularly attractive for use in space-constrained areas such as the old quarry that Kleen Energy is repurposing for the substation.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues