Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Siemens Provides Significant High Voltage Equipment for Northeast Utilities’ Transmission Projects

Siemens Power Transmission & Distribution, Inc. (SPT&D) announced that Northeast Utilities (NU) has purchased four of its new 550-kV dead tank circuit breakers with FA5 spring-spring operator technology – the first of their kind in the United States. The SPS2-550 outdoor SF6 gas-insulated breakers provide fast, reliable operation for utility applications at extra high voltage transmission levels. The breakers will be used in the Long Mountain Substation upgrade in New Milford, Connecticut.

The FA5 spring-spring operating mechanism and 3AP arc-assist interrupter allows high speed closing, reclosing and two cycle fault interruption with minimal maintenance. The breakers are designed for zero crossing switching and protective duties at 550-kV maximum rated voltage, 2000, 3000, 4000 and 5000 amperes continuous current and 40, 50 or 63 kA maximum symmetrical interrupting capability.

“SPT&D’s Transmission Products Division has continued to invest in our proven line of SPS circuit breakers and has now expanded our offering to customers with the new 550 kV dead tank circuit breakers with FA5 spring-spring operator technology,” said Carl Lockhart, product marketing manager for SPT&D’s Transmission Products Division. “Siemens is pleased that NU Transmission has chosen the SPS2-550 to use on its extra high voltage transmission system. By advancing our technologies, we are able to offer products to help our customers further increase their reliable service to their communities.”

Siemens has also received a second contract from Northeast Utilities for three variable capacitance/reactance shunt reactors for use in the utility’s 345-kV transmission line upgrade in southwest Connecticut.

The first shunt reactor contract was awarded in 2005 with the 2006 delivery of three of the highly specialized shunt reactors built in Nuremburg, Germany. Variable shunt reactors are unique; therefore there are few manufacturers with the capability and experience to provide such advanced technology. Siemens has built some of the largest reactors in the world including 400 kV 250 MVAr reactors in Kuwait. The reactors purchased by Northeast Utilities are 150 MVAr and 100 MVAr units.

The shunt reactors are part of the 345-kV Middletown-Norwalk, Connecticut project – a 69-mile transmission line with 57 miles of 115-kV line from central Connecticut to the southwest corner of the state. The project, built jointly with The United Illuminating Company (UI), is scheduled to be in service in 2009. UI has purchased the same shunt reactors for its portion of the project.

A shunt reactor is used to compensate for the capacitance of a power line or, in this instance, an underground power cable to keep the voltage at the proper level.

“These specialized shunt reactors are an integral part of the transmission line configuration that will provide NU with the ability to increase reliability to our customers,” said Jerry P. Fortier, Project Manager-NU Transmission.
Due to the location of the shunt reactors near residential neighborhoods, NU had a special requirement specifying a noise level of no more than 60 decibels. Siemens has invested significantly in low sound level technology – particularly for transformers – and has a great deal of experience in this area, largely because Siemens’ home country, Germany, has significant noise restrictions. Siemens built a sound enclosure around the main tank of the reactor consisting of a steel house with sound absorbing materials, rubber under the foundation, and other innovations to achieve a very low sound level.

The Middletown-Norwalk project is an important step toward meeting the growing demand for electricity while easing a major system bottleneck in southwest Connecticut.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues