Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Siemens HVDC Converter Stations to Link Netherlands and the UK

Siemens Power Transmission and Distribution (PTD) and Dutch consortium partner BAM Civiel have been contracted by Britain’s National Grid and Dutch grid operator TenneT to supply the converter stations for the BritNed interconnector project. The 260 km long HVDC submarine cable link between the Isle of Grain in Kent, southeast England, and Maasvlakte near Rotterdam will allow power transmission of 1000 MW at a DC transmission voltage of 450 kV. The total value of the order to the consortium is about EUR 220 million. Commissioning is scheduled for late 2010.

The high-voltage direct current (HVDC) link between the UK and the Netherlands is being constructed to improve reliability of the power grids in both countries and enable greater competition in the network. In addition, the HVDC link meets European Commission demands for greater interconnection of the grids. Power will soon flow in both directions with minimal losses and at low cost, and its price will be set by the power markets in both countries.

As consortium leader, Siemens is responsible for equipping the complete HVDC system and will be supplying both converter stations with key parts including converter valves, converter transformers, smoothing reactors, protection and control equipment and both AC and DC filters. BAM Civiel is responsible for all earthwork and construction.

National Grid also ordered the HVDC transmission route Basslink, which was built by Siemens Power Transmission and Distribution (PTD) and, after a successful trial period, handed over to the British utility last year. Currently the longest submarine power cable in the world, Basslink has been in service since late April 2006, enabling the low-loss exchange of electricity between mainland Australia and Tasmania.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues