Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Siemens to Construct New Long-Distance HVDC Transmission Link in India

Siemens Power Transmission and Distribution (PTD) and consortium partner
Bharat Heavy Electricals Ltd (BHEL) have been awarded an order by the Power Grid Corporation of India Ltd, New Delhi, to construct a 780 kilometer (485 mile) long high-voltage direct-current (HVDC) transmission route between the provinces of Uttar Pradesh and Rajasthan. The purpose of the new HVDC transmission system is to strengthen the power supply to the growing region around the megacity of New Delhi without the need to build additional power plants. The order has a total value of approximately 235 million euros financed by World Bank, with Siemens’ share amounting to about 170 million euros. Final commissioning is scheduled for November 2009.

The planned project is the fourth long-distance HVDC transmission link in India and will have the highest power rating of all. In the future, the bipolar 500-kV direct-current transmission system with a power rating of 2500 MW will transport electrical energy with low loss from Ballia in the east of Uttar Pradesh province to Bhiwadi, 780 km (485 miles) away in the province of Rajasthan near New Delhi. In comparison to a conventional 400 kV AC transmission line this HVDC transmission link improves energy
efficiency so that 688.000 tons of CO2 will be saved.

As head of the consortium, Siemens has overall responsibility for the project, including the design of the complete HVDC transmission system. Siemens will deliver the bulk of the core components such as converter valves, converter transformers, smoothing reactors, protection and control systems, and the AC and DC filters. The company is also undertaking the transport functions, construction work and the installation and startup
of the HVDC transmission system. The consortium partner BHEL is supplying the converter transformers for the Bhiwadi converter station and components of the AC switchgear for both converter stations.

The new long-distance HVDC transmission link is the second system that Siemens is building in India. The first high-voltage direct-current transmission route was the "East-South” long-distance link, which still currently ranks as the second longest HVDC transmission link in the world. Since 2003, the Siemens system has been transporting electrical energy with low loss from the Talcher power plant complex in the state of Orissa in the east of India over 1450 km to the industrial region around Bangalore in the south. This system was originally designed for 2000 MW transmission. In the summer of
2006 Powergrid Corporation of India commissioned Siemens to upgrade the power rating of this HVDC transmission system. The upgrade will optimize utilization of the system’s overload capacity of up to 2500 MW, and thereby enable the power supply company to keep pace with the growing demand for energy in the region around Bangalore.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues