Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Siemens to Build Turnkey Substation for Infrastructure Project on Island

Siemens Power Transmission and Distribution (PTD) is constructing a turnkey substation (400/132 kV/22 kV) for the power supply on Saadiyat Island, which is situated 500 meters off the coast of Abu Dhabi. The order, which is worth about 120 million euros, was placed by the state power supply company TRANSCO (Abu Dhabi Transmission & Dispatch Company). In addition to construction of the substation, the contract also comprises engineering and commissioning. The substation is scheduled to go into operation at the End of 2008.

The infrastructure of the island which has an area of about 27 square kilometers (10.5 square miles) is due to be fully developed by 2018 in what is currently one of the most important ongoing infrastructure projects in the Emirate of Abu Dhabi, with a total investment volume of about US$ 27 billion. The three-phase development project will transform Saadiyat Island into a tourism center with accommodations for about 150,000 future residents. Scheduled are 8000 private houses, 38,000 apartments and 29 hotels with over 7,000 rooms. The turnkey substation will play a central role in supplying the power needed on the island. The main component of the substation, the gas-insulated high-voltage switchgear, will be manufactured by Siemens at its plant in Berlin.

Siemens can draw on extensive experience with the delivery of 400-, 220- und 132-kV substations for environmental conditions such as those that prevail in the Middle East. Substations in this region have to be earthquake-proof and must be designed for ambient temperatures of up to 55°C in the shade, for sandstorms with wind speeds of up to 160 km/h (100 mph), and for saline sea air at high humidity.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues