Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Statnett and E.ON Netz Launch Joint Feasibility Study for a DC-Cable Between Norway And Germany

The Norwegian and German transmission system operators, Statnett and E.ON Netz agreed to launch a joint study to assess the technical and financial potential for building NORD.LINK, a sub sea DC-cable between Norway and Germany. The capacity of such a new interconnector is expected to be in the range of 700 to 1400 MW. The feasibility study will start immediately.

The two companies will investigate potential benefits and risks resulting from an interconnector between the two electrical systems of continental Europe and the Nordic countries. Different patterns of generation with large thermal and growing wind power on the Continent versus large hydro capacities in Northern Europe are expected to offer mutual benefits, however on the other hand there may be some risk of worsening existing bottlenecks in the grid.

NORD.LINK is expected to be financially rewarding for both generators and consumers based on similar fundamentals as in the past and expected developments in consumption, production and prices in both markets. The feasibility study will analyse the relevant matters in relation to NORD.LINK prior to a possible investment decision.

A cable between Norway and Germany is listed in the EU`s program for trans-European electricity networks (TEN-E program) which aims for improved market integration in Europe and insofar supported by the EU.

Statnett and E.ON Netz intend to finalize their feasibility study by autumn 2008.  Then on the basis of the results talks with the national regulators for ensuring an appropriate return on investment will be started.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues