Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

High-Temperature Superconducting Cable Project is On-Line in Albany, New York

The world’s first in-grid superconducting power cable has gone online in Albany, New York. As mentioned in the August 11, 2006 issue, with more details here, the 350-m underground cable—a demonstration of high-temperature superconducting (HTS) applications to improve electric power transmission and distribution—is operating at 34.5 kV, with a nominal current carrying capacity of 800 A. The cable—developed under the direction of SuperPower, Inc., Schedectady, NY, with partners Sumitomo Electric Industries Ltd. of Osaka, Japan, and BOC of Murray Hill, New Jersey, one of the world’s largest suppliers of industrial gasses —links the Riverside and Menands substations of the North Albany Service Center of National Grid. BOC is responsible for the cryogenic refrigeration system and remote operating center.
The system at the Albany cable project currently uses first-generation HTS wire, but in a later phase, scheduled in about a year, a portion of the system will be replaced with cable using second-generation conductor to further demonstrate its viability. The second-generation HTS conductor, developed by SuperPower, is considered more cost-efficient and commercially viable than first-generation HTS.
“Use of HTS technology in electric power transmission and distribution has the potential for enormous impact on consumers and the utility industry,” said Philip J. Pellegrino, president of SuperPower. “Congestion on our electrical highways has become a major problem. Not only does inefficiency in the current system cost consumers billions of dollars a year, it also threatens the overall reliability of our power delivery network. HTS cable technology enables transmission and distribution of power through much smaller cables than comparably rated conventional copper conduits—plus HTS technology is safer and more environmentally friendly. All of this is especially important in congested urban areas.”

The cable system uses first-generation BSCCO-based HTS wire and will be in operation for about a year. At the same time the team will work on the project's second phase, consisting of a 30-meter section of cable using more than six miles of SuperPower's second-generation YBCO-based HTS wire, which is expected to be substantially less expensive to manufacture. That will replace a segment in the existing cable, which is expected to further improve the performance of the cable, ultimately reduce the cost of the system and improve prospects for commercialization.

“A growing economy depends on reliable and efficient electricity delivery,” said Ed Garcia, vice president, PGS Ventures, BOC. “One HTS cable can deliver three to five times more power than a conventional cable. This means utilities can accommodate demand increases without having to add multiple distribution lines. With the U.S. Department of Energy projecting world electricity demand to grow at an average rate of 2.6 percent per year, this startup is particularly timely as we work to develop new solutions for our aging energy infrastructure.”

“Since work on the $26 million HTS cable project began nearly three years ago, the technology behind the HTS system has been tested extensively, ensuring it can withstand real-world rigors and demands, such as ground faults and trips”, Garcia said. To ensure reliability, BOC is monitoring the HTS cable system from its Remote Operating Center in Bethlehem, PA. Real-time indicators at the center allow operators to make necessary adjustments to the cryogenic system to keep the cable system running.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues