Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Abu Dhabi’s Transco to Add Five Substations to Power Distribution Network

Siemens Energy has received an order from the Abu Dhabi Transmission & Dispatch Co. (Transco), Abu Dhabi’s national electricity grid operator, as part of the project to expand the country’s power distribution network. Siemens and its partner Electromechanical LLC will supply five turnkey transformer substations including switchgear for the project. Siemens’ share of the order is worth a total of approximately EUR150 million.

“The Middle East plays an important role for Siemens. In the wake of the massive economic shift away from the dominance of oil toward logistics, for example, and increased tourism the region is literally thirsting for infrastructure solutions,” said Peter Löscher, President and CEO of Siemens AG. He is currently part of a delegation accompanying Federal Chancellor Angela Merkel in the lower Gulf region. In the prior fiscal year Siemens posted revenue in the region totaling approximately EUR1.2 billion and new orders amounting to EUR1.7 billion.

The substations – which will supply power to the CO2-free Masdar City and Abu Dhabi’s new airport, for example – are scheduled for completion by 2013. “We’re proud that Transco has again opted for field-proven, first-class equipment from Siemens for the expansion of Abu Dhabi’s electricity grid,” said Löscher. Abu Dhabi, the capital of the United Arab Emirates (UAE), is expanding its electricity supply network on an ongoing basis in order to keep pace with the rising demand for energy. Analysts expect that electricity demand in the country will continue to grow by ten percent each year.

The order entails the turnkey supply of three 132/11 kV transformer substations and two 132/22 kV substations. They will be equipped with 20 Dresden-built 40-MVA transformers, gas-insulated switchgear, and protection and control equipment. A total of 356 gas-insulated switchgear bays comprising 46 for the 132-kV voltage level, 124 for 22 kV and 186 for 11 kV are to be supplied from Siemens’ plants in Berlin and Frankfurt.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues