Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Commission proposes transmission line siting guidelines; public participation key component

The Federal Energy Regulatory Commission today proposed regulations to coordinate all federal authorizations and related environmental reviews of proposed transmission facilities in designated national interest electric transmission corridors. The regulations would apply to entities filing applications for transmission line facilities.

“Today, we act to strengthen our energy infrastructure by issuing proposed rules to implement the transmission siting provisions of the Energy Policy Act of 2005. These rules will govern the issuance of construction permits by the Commission for projects that meet the statutory criteria,” Chairman Joseph T. Kelliher said. “However, it is important to note that our regulations are intended to supplement the traditional state siting process. I would expect that most transmission projects would continue to be sited by states under state law. Our jurisdiction to issue a construction permit applies only under limited circumstances, and our proposed rules respect those limits.”

The Energy Policy Act provides for federal backstop siting authority of certain electric transmission facilities in order to increase transmission capacity and maintain system reliability. Upon the Secretary of Energy’s designation of national interest electric transmission corridors experiencing electric transmission capacity constraints or congestion that adversely affects consumers, the Commission may issue permits to construct or modify electric transmission facilities if the Commission finds:

  1. The applicant for the facility does not qualify to apply for siting approval in the state because the applicant does not serve end-use customers in the state;
  2. The state with siting authority takes longer than one year after the application is filed to act; or
  3. The state imposes conditions on a proposal such that it will not significantly reduce transmission congestion or it is not economically feasible.
“The Department of Energy deserves praise for how it has proceeded with respect to its transmission congestion study, and I am confident the Department will designate transmission corridors in a timely manner, consistent with the statute,” Chairman Kelliher said. “Our two agencies are working together closely and productively. In particular, I commend the Department for its recent order that delegated to the Commission lead agency status once a permit application is filed.”

The Secretary of the Department of Energy, effective May 16, 2006, determined that the Commission’s expertise in siting energy facilities would prove beneficial to this process and, as a result, delegated to the Commission certain aspects of the coordination of federal authorizations and related environmental review.

A proposal to build or expand electric transmission facilities brought before the Commission must be used for interstate commerce, be consistent with the public interest, significantly reduce transmission congestion in interstate commerce, be consistent with national energy policy, and maximize as much as possible existing towers and structures.

In today’s proposed rule, the Commission seeks to facilitate maximum participation from all interested stakeholders through a Public Participation Plan and an extensive pre-application and post-application process. The proposed participation plan would provide all interested parties, including affected landowners, with information on all aspects of the proposed project, including national and local benefits and environmental impacts. The participation plan ensures ample opportunity for public involvement during the pre-filing and application processes. The participation plan would be accessible in a central location in each county through which the proposed project would be located.

The proposed pre-filing process includes a consultation with the Director of the Office of Energy Projects (OEP), the start of environmental review under the National Environmental Policy Act, numerous public participation opportunities, and a determination by the Director of OEP that an application is ready to be filed for Commission consideration.

Once an application is filed, the proposed rule calls for notifying the public of the application, issuing and soliciting comments on the draft environmental document, preparing and issuing a final environmental document, reviewing the record and issuing a final decision by the Commission.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues