Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Transpower Proposes HVDC Pole 1 Replacement

Transpower, New Zealand, submitted an investment proposal with the Electricity Commission on May 2, 2008, to replace Pole 1 of the HVDC inter-island link. The new pole will be a state-of-the-art thyristor valve unit and will increase the capacity of the overall HVDC link to 1000 MW from 2012, and 1200 MW from 2014.

The HVDC link, which links Benmore Substation in the South Island and Haywards Substation just north of Wellington, consists of two separate circuits, each with its own major converter system at each end. The converters are called Pole 1 and Pole 2. The current Pole 1 includes equipment that is 43 years old and was shut down late last year. Half of that pole has now been returned to service for use in critical periods. Pole 2, which was fully commissioned in 1992, continues to operate reliably and has been able to carry additional electricity since Pole 1 was shut down.

The HVDC link also includes three undersea cables across the Cook Strait – two connected to Pole 2 and one to Pole 1. These three cables are in good condition.

The HVDC inter-island link is a key part of New Zealand’s electricity makeup. It provides:

  • the South Island with access to the North Island’s gas and coal generation, (important for the South Island during dry winter and summer periods)
  • the North Island with access to the South Island’s large hydro generation capacity (important for the North Island during peak winter periods).

Transpower’s Chief Executive Patrick Strange said that the technology that the existing Pole 1 uses was ground breaking technology when developed but has now been superceded by better, more efficient thyristor technology.

“The investment proposal for a new Pole 1, estimated to cost around $700 million, follows many months of consultation and engagement with interested parties on the approach, assumptions, methodology and options in investigating the need for a replacement.”

“The HVDC link is an important link for New Zealand as it balances the energy use between islands, which is more sustainable for the country. It also helps to facilitate renewable generation.”

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues