Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Spacer Cable Alternative

Hendrix Wire & Cable has completed a project for Clark Energy Cooperative, a non-profit electric utility headquartered in Winchester, Kentucky.

Clark Energy needed to add a circuit to an existing double circuit bare wire system out of a substation in Stanton, Kentucky. The project spanned 4,416 circuit feet and was originally conceived to be a conventional triple bare wire circuit. Hendrix worked with Clark Energy and designed a spacer cable system that could be built under the existing double circuit bare wire system. After detailed engineering analysis, Clark elected to go with the spacer cable alternative.

Todd Peyton, manager of engineering at Clark Energy commented that the “Stanton Project’s actual cost, including make ready – which involves moving transformers, installing anchors, etc. was $19.58/ft. This is less than 30% the cost I estimated to rebuild the existing Double Circuit with conventional triple circuit wire.”

Spacer cable has been used by utilities for many years to improve the reliability and power quality of primary distribution systems while making them more resistant to storm damage. The cable design, system strength, and compact configuration can also serve to address other concerns that can crop up on a utility’s distribution system. The compact configuration and reduced clearance requirements allow for multiple circuits to be installed on a single pole, and thus combating right of way problems and saving money by reducing the number of poles required. Over or under building spacer cable systems in substation exits, alleyways, and feeder circuits can greatly reduce the cost of adding capacity.

Hendrix Wire & Cable http://www.hendrix-wc.com/hendrix/

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues