Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

American Transmission Company’s Rockdale-West Middleton Project Underway

After more than five years of public involvement and regulatory review, the Public Service Commission of Wisconsin approved a vital addition to Dane County’s electric transmission system to be constructed by American Transmision Co. This project will serve multiple reliability functions and involves constructing approximately 32 mi of new 345-kV transmission line to connect the existing Rockdale Substation located near the Town of Christiana with the West Middleton Substation in the town of Middleton. The substations will require some equipment upgrades to support this new line.

Dane County has experienced in recent years some of the highest growth rates in the state, both in population and electricity usage. The existing transmission system in and around Dane County brings power in from outside the county to meet the needs for electricity.

However, the system is operating at its limits and additional transmission lines are needed to keep pace with the growing dximetely $215 million.emand, and to strengthen the efficiency and reliability of existing lower voltage lines. The line will be constructed on steel poles at a cost of approximately $215 million.

Currently the work underway involves doing test soil borings for the transmission structure foundations. It’s a pretty safe bet in Wisconsin that the ground is frozen in January. That makes it an ideal time to conduct these soil boring, a necessary step in designing transmission lines. Taking advantage of frozen conditions minimizes environmental impacts. To that end, this month ATC ed drilling small (2- to 3-in diameter) bores at depths of up to 40 ft along the 32-mi route for the Rockdale-West Middleton project.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues