Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Brazil Utility Energizes 3M ACCR in Line Upgrade at Paraná River Crossing

Companhia de Transmissão de Energia Elétrica Paulista (CTEEP), has completed the installation of 3M’s Aluminum Conductor Composite Reinforced (ACCR) across the Paraná River as part of a key line upgrade designed to bring more power to rapidly growing southeastern portions of Brazil.

The lightweight, sag-resistant ACCR provides more than twice the capacity of conventional conductors of similar size without requiring construction of new or enlarged towers. Installed in only six days, CTEEP’s 1.1-mi, 138-kV ACCR line, crossing the nearly mile-wide Paraná River, is boosting power transmission for the Jupiá Electrical System. Ampacity on the line was increased by 121 percent, with a 36 percent reduction in weight, using only the existing structures.

CTEEP, which is principally owned by Grupo Empresarial ISA (ISA Group), one of South America’s largest electricity and telecommunications providers, supplies most of the electricity consumed in São Paulo State and about 30 percent of the electrical power used nationwide.

“The installation process went smoothly, and the line was energized on February 15th,” says CTEEP engineering manager Caetano Cezario Neto. “Had we upgraded with a heavier conductor, we would have had to not only build larger towers but also change the concrete foundations that rise out of the river to support the new towers, probably requiring the use of dynamite in an environmentally sensitive area. Instead of six days, it would have taken much longer and been more costly.”

Tim Koenig, director of the 3M High Capacity Conductor Program, notes that the 3M ACCR is scheduled for installation this spring by a second Brazilian utility, CPFL Piratininga, a power distribution unit of CPFL Energia, in a very densely populated area where tower enlargement would have been difficult because of nearby homes.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues