Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Brazil’s CTEEP Chooses 3M ACCR for Line Upgrade

One of Brazil’s largest electric utilities, Companhia de Transmissao de Energia Eletrica Paulista (CTEEP), will install the 3M Aluminum Conductor Composite Reinforced (ACCR) to upgrade the capacity of a key transmission line crossing the Parana River. The lightweight, sag-resistant conductor provides more than twice the capacity of conventional conductors of similar size without requiring construction of new or enlarged towers.

CTEEP, which is principally owned by Grupo Empresarial ISA (ISA Group), one of South America’s largest electricity and telecommunications providers, supplies almost all of the electricity consumed in the State of Sao Paulo and 30 percent of the electrical power consumed nationwide. The line will boost capacity for power transmission for the Jupiá Electrical System. The line crosses the nearly mile-wide Parana River and is subject to strong winds and extremely high temperatures.

“3M ACCR was determined to be the most cost-effective, proven solution available,” says CTEEP engineering manager Caetano Cezario Neto. Installation is scheduled to begin immediately.

Tim Koenig, director of the 3M High Capacity Conductor Program, says 3M ACCR is under evaluation in several other countries, as well as by large and small domestic utilities, as a solution to the problem of bottlenecks, especially on lines where permitting and construction of new towers or obtaining additional rights of way would create major problems and delays. “There is a growing recognition that this a proven, reliable and cost-efficient conductor that provides substantially greater capacity while minimizing the risks and environmental concerns associated with tower construction,” says Koenig. “The performance and reliability of this conductor have been persuasively established over years of field tests and commercial use, under all kinds of harsh environmental and operating conditions.”

ACCR’s strength and durability result from its core, composed of aluminum oxide (alumina) fibers embedded in high-purity aluminum, utilizing a highly specialized and patented process. The constituent materials are chemically compatible with each other and can withstand high temperatures without adverse chemical reactions or appreciable loss in strength, even over long periods of time.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!


Gain insight into Oracle's entry into the Utility Applications market place

Sponsored by Oracle

This session is a peak into how Oracle is executing the strategy one year later. A key aspect of this transition is how a customer project, like Hawaiian Electric made it through the transition.

Register Now!

More Webcasts

Featured Activity

Autovation 2008

Utilimetrics: Alliance for Advanced Metering & Data Management Solutions (formerly AMRA) is planning a dynamic AMR/AMI conference. Autovation 2008: The Utilimetrics International Symposium, Sept. 7–10 in Atlanta, GA, will bring together AMR/AMI experts and key personnel for four days of the latest and most innovative utility automation strategies and technologies.

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • August Issue
  • July Issue
  • June Issue
  • May Issue
  • April Issue
  • March Issue
  • February Issue

Browse Back Issues