Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

BritNed Submarine HVDC Cable to Connect UK and The Netherlands

National Grid and NLink - a subsidiary of TenneT - are building an electricity interconnector between Britain and the Netherlands called BritNed. The BritNed cable will join the electricity transmission systems in the UK and The Netherlands making a significant contribution to the security and diversity of electricity supplies in both countries. It will also facilitate further competition by helping to enhance the (north-west) European energy market.

BritNed consists of bundled power cables and associated equipment to connect the two networks and will be capable of carrying power in either direction (dependent on market conditions). The cable will have a nominal capacity of 1000 MW, will be 260 km (161.6 mi) long and cost around 600 million EUR to build. The first stage of construction (preparatory and environmental mitigation) has started and capacity will be available in late 2010.

Converter stations will be also built on the land to convert the power from direct current to alternating current. These converter stations will be built at Grain in the UK and the Maasvlakte, near Rotterdam, in Holland at existing electricity substations.

The BritNed project is a joint venture between subsidiary companies of TenneT Holding and National Grid.

Construction - Converter Stations
Preparatory works are underway for BritNed and are progressing well. At Grain work to prepare an access road for the converter station has started and will be complete by September 2008. Site mobilization for the converter station will also start this September.

The civil works at the Maasvlakte in Holland are planned for October 2008.

Construction - Cable Laying
Work to lay the land cables at Grain and in the Maasvlakte is planned for November 2008 and the marine installation of the cable will start in June 2009.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues