Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

CL&P, UI Energize Middletown-Norwalk Project Ahead of Schedule

The Connecticut Light and Power Co. (CL&P), part of the Northeast Utilities System (NU), and The United Illuminating Co. (UI), part of the UIL Corporation (UIL), today announced that the Middletown-Norwalk (M-N) transmission project has been energized, nearly one year ahead of schedule, improving reliability for Connecticut and the region’s electric customers.

The project – one of the largest electric infrastructure upgrades in the country – is a joint effort of CL&P and UI, and consists of 69 mi of 345-kV high-voltage transmission lines through 18 Connecticut cities and towns. The project finished early and is expected to cost approximately $1.27 billion, significantly under budget, providing real savings for customers. Spanning seven-and-one-half years, the project completes a loop linking the southwest part of the state to the nearly 400 mi of 345-kV lines that already run through the rest of Connecticut.

“Energizing the Middletown-Norwalk project brings improved reliability for electric customers in Connecticut and the region,” said Charles W. Shivery, NU chairman, president and chief executive officer. “The Middletown-Norwalk project marks the closure of the southwest Connecticut transmission projects. These new transmission facilities enable us to meet national reliability standards, which provide a more secure regional transmission grid.”

Construction of the M-N project included 45 mi of overhead lines and 24 mi of underground lines, along with 57 mi of reconstructed 115-kV lines. In addition, the project’s stellar safety record – over 2.6 million man-hours worked in the last two-and-one-half years – was more than 10 times lower than the Bureau of Labor Statistics’ national average rate.

“Southwest Connecticut and the region enter a new era with this important transmission upgrade,” said James P. Torgerson, president and chief executive officer of UIL Holdings Corporation and UI chief executive officer. “The Middletown-Norwalk project is an example of how technology and partnership can help enhance electric reliability for the region.”

In energizing the project ahead of the original 2009 schedule, CL&P and UI acknowledged the extraordinary teamwork and cooperation from both companies; town officials; the Connecticut Department of Transportation; the Connecticut Siting Council; the Connecticut Department of Public Utility Control; the Connecticut Department of Environmental Protection; the Federal Energy Regulatory Commission; the Army Corps of Engineers; and contractors Burns & McDonnell, PAR Electrical Contractors, Bond Brothers, Black & Veatch, McPhee Electric, J. Wm. Foley, Inc. and Siemens.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues