Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

ComEd’s 345-kV West Loop Project Nears Completion

Commonwealth Edison’s (ComEd) ambitious effort -- the West Loop project -- to bring 345-kV bulk power into Chicago’s central business district to improve reliability has reached its 95 percent completion milestone. The project installs the additional bulk power capacity, much of it underground, to serve Chicago’s growing load requirements, while converting the electric transmission system from a “hub and spoke” design to a network model, by providing central Chicago substations multiple sources of supply. The required completion date is June 1, 2008. According to Bruce Whiteway, Program Manager, “We will finish ahead of that date and under budget.”

The project consists of new equipment at 11 of ComEd’s substations, and two new 345-kV transmission lines. One line is approximately 10 miles in length and connects the ComEd Crawford Substation on the near south side (see diagram) to the new 345-kV substation at West Loop on the north side. A second 345-kV line, approximately 3 miles in length, connects West Loop to the existing Taylor Substation. Approximately 8 miles of the new 345-kV lines are installed underground in trenches in city streets and in a tunnel under the Chicago River. West Loop Substation is located on Goose Island, an industrial area in the north fork of the Chicago River. Tunnels 55 ft below the surface enable the transmission lines entering West Loop to pass beneath the Chicago River.

Whiteway explained, “The circuit distance from Taylor to West Loop is about 3 miles and that portion is entirely underground. Of the 10 miles from Crawford to West Loop, approximately 5 miles is underground; the first portion is overhead. For about the last 3 miles into West Loop, the circuits are co-located in the same trench. While the co-located circuits run in the same trench, we put the cable joints in separate vaults as an added reliability feature.”

Overhead construction included about 3 miles on existing overhead transmission poles and 1.6 miles of new construction on 27 monopoles on concrete caisson foundations.

The 345-kV solid-dielectric cables used for underground transmission are comprised of cross-linked polyethylene (XLPE) insulation and 1600 mm square cooper conductor supplied by Prysmian Cables & Systems. Whiteway said, “The cable is installed in a duct package. We create a matrix of PVC duct in a concrete protective casing buried under city streets. In some places such as under highways and railroads, in addition to under the river, we had to tunnel or push pipe casings to install the cable.”

Major challenges for the utility and its contractors on this job, according to Whiteway included installing cables in the city streets, tunneling under the Chicago River, and installing two huge autotransformers at the West Loop Substation. “With the excellent cooperation and support from the City of Chicago, the street installations went in without complaint,” Whiteway said. The autotransformers were shipped from The Netherlands, where they were manufactured, to the Port of Burns Harbor, Indiana –at the southern end of Lake Michigan. From, there they traveled by barge through Lake Michigan and into the Chicago River to Goose Island where they were offloaded onto a special vehicle for transport to the substation.

Contractors for the project included Kenny Construction Co. as prime contractor and tunneling contractor; Sargent & Lundy, LLC was the primary engineer; HBK Engineering, LLC designed the duct packages and handled the permitting; MJ Electric was the subcontractor for overhead transmission construction and substation electrical work. Cable supply, installation and testing was done by Prysmian.

Other major suppliers were SMIT (transformers at West Loop), Siemens (345 kV gas-insulated switchgear at West Loop), Mitsubishi (gas-insulated switchgear at Taylor), and Trench (345 kV air-core inductors at Calumet).

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues