Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Work Begins to Rebuild Elba’s 132-kV Line

Work will begin in mid-September for rebuilding the 132-kV “S.Giuseppe-Portoferraio” line on Elba, Italy, the first part of a project for developing Elba’s electricity grid that will lead to grater benefits regarding the service’s safety and reduced environmental impact.

Terna’s technicians met in a meeting organized by the Transit Authority of the Province of Livorno to discuss aspects regarding the coordination of the buried cable laying activities on the Island and to define changes in the transit system that will have to be implemented. Cable-burying work will inevitably cause inconveniences to the transit system for several months: the time frame is divided into two phases: the first one from September 2009 to May 2010; the second one from September 2010 to December 2010.

In apologizing for the inconvenience, Terna confirms that the work will not hinder regular tourist activities since there will be a summer pause.

The beginning of the work follows and implements the authorization decree for the project issued by the Ministry for Economic Development on December 2, 2008 after the project was also approved by all the local bodies involved (Regional authorities, Province of Livorno, Municipality of Portoferraio, Municipality of Rio nell ’Elba, Municipality of Rio Marina, National Park of the Tuscan Archipelago, Mountain Community of the Tuscan Archipelago).

The route that was authorized in 2008 was improved with respect to the one initially proposed in 2006:

  • the segment of buried cable was nearly doubled, increasing from 4.5 km to 8.7 km (over half of the total length);
  • the overhead segment was reduced, from 9 km to approximately 7 km.

The project significantly reduces the electricity line’s environmental impact, confirming Terna’s commitment toward promoting the electricity grid’s sustainable development. The completion of the line will allow demolishing the existing “S.Giuseppe-Portoferraio” line which involves the removal of 48 pylons for a total of 13 km: considering that only 20 new pylons will be built, the old/new ratio will be of over 1 to 2. The project also includes a new overhead route that will involve a mountainous area that is scarcely populated and will also free valuable densely populated urban areas while also protecting the special reserve in the Volterraio area.

The development measures along the island’s electricity grid also include building a second 132-kV “Isola d’Elba – Continente” connection largely formed by a submarine cable between the area of Piombino and Portoferraio, yet to be authorized.

The work’s total investment equals approximately 50 million euros and is in line with the Development Plan; it will be paid for by the electricity bills of all Italian citizens. This sum will also include greater costs, for over 20 million euros, regarding the changes made to the original project.

Overall, the project is essential for guaranteeing greater safety, reliability and efficiency in the island’s electricity system. Furthermore, it will avoid completing the 132-kV ring within the island (Cala Telegrafo – S.Giuseppe – Procchio – Porto Azzurro – Portoferraio), and consequently the installation of an additional 80 pylons.

The project for the new “S.Giuseppe-Portoferraio” line represents an example of excellent coordination with the local bodies and is a reason for great satisfaction for all the Municipalities since most of the power line will be rebuilt using buried cables.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues