Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Fenno-Skan 2 Cable Link Completed for Use by the Electricity Market

Fenno-Skan 2, the high-voltage direct current electricity transmission connection between Finland and Sweden, is now ready. The project extending over several years was completed December 16, 2011, when the construction work for the direct current converter stations was accepted. The submarine cable was laid in the Gulf of Bothnia earlier this year. Some of the capacity of the connection has been available to the electricity market during the trial operation period, and now the market has access to the full capacity.

Fenno-Skan 2 will improve considerably the functioning of the Nordic electricity market. There has not been sufficient electricity transmission capacity on the border between Finland and Sweden this year. The physical transmission capacity has been about the same as in the previous years, but the electricity market would have required clearly more transmission capacity. This is why some of the capacity of Fenno-Skan 2 was made available to the market in the trial operation period from 15 November onwards. From 16 December, the new electricity transmission connection of 800 MW is fully available to the market, increasing the transmission capacity between Finland and Sweden by 40 per cent.

Fenno-Skan 2 is an 800 MW and 500-kV high-voltage direct current (HVDC) electricity transmission connection. The total length of the link is approx. 300 km, of which the actual submarine cable accounts for some 200 km. The project was carried out in co-operation between Fingrid Oyj and Svenska Kraftnät. The construction of the transmission link cost a total of approx. 315 million euros.

ABB of Sweden was responsible for the overall contract for the converter station in Finland. The contract covered earthwork, new valve hall, DC converters with foundations, DC and AC bays with their devices, and the control and protection system of the link. At the same time, another converter station was built at the opposite end of the link at Finnböle in Sweden.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues