Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.


  

Long Island Sound Cable Replacement Project Nears Completion

CL&P and Long Island Power Authority (LIPA) are replacing seven fluid-filled transmission cables between Norwalk, CT and Northport, NY with three new solid-core cables that will be buried beneath the seabed of Long Island Sound. The projected in-sservice date is fall 2008. The original cables were removed in December, 2007 and January, 2008. The new cable has been installed on the Connecticut side and cable burial of the remaining 16 miles of cable in New York waters commenced the first week of May.

The replacement cables will significantly improve reliability of service to both states and reduce environmental impacts associated with fluid leaks from anchor drags and boat fishing dredges. LIPA and CL&P have jointly owned and operated the seven cables since 1969.

The facility consists of approximately 11 mi of three 138-kV electric transmission cables installed beneath the bed of the Long Island Sound. The cables will have the same  nominally rated transfer capability of 300 MW as the original cables with two of the three cables in service. The new cable is being buried beneath the seabed of Long Island Sound to prevent future problems associated with anchor dragging damage.

The cable manufacturer, Nexans, also did the cable installation using their cable laying ship, Skagerrak, shown in the photo in Long Island Sound waters.

According to a CL&P spokesman, the cable is considered a reliability asset to the grid. “At some peak times in the summer, we find the transfer of power to be critical to both sides, depending on which side is in need of greater capacity from outside.”

Want to use this article? Click here for options!
© 2012 Penton Media Inc.

T&D TV

Most Read


Find Other Popular Items

Community

T&D World TV


Thomas & Betts - Collaboration. Commitment. Customer-Focus: Our promise to you. With over 50 years of pioneering design expertise and a partnership approach to every project, Thomas & Betts has a well-earned reputation as an innovator and a problem solver. Watch Now »


Siemens - Covering the entire spectrum of energy automation. Watch Now »

Podcasts

Building a Smarter Grid: Managing Assets to Improve Utility Decision Making
Sponsored by ABB
Join Greg Scheu, President and Head of Power Products for ABB, and Rick Bush as they discuss how utilities can extract more value from existing grid infrastructure by managing the overall assets of the T&D operation. Listen Now »

More from Building A Smarter Grid


Electromagnetic Pulse Discussion with Eric Hsieh
NEMA Government Relations Manager Eric Hsieh discusses an EMP and its possible effects on the electric grid.

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues