Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

MYR Group and Quanta Services Selected as Construction Alliance Partners for CapX2020 Transmission Projects

CapX2020 announced it selected MYR Group and Quanta Services, Inc. to provide construction services for the CapX2020 Group 1 transmission line projects. CapX2020 is a joint initiative of eleven transmission-owning utilities in Minnesota and the surrounding region proposing to build more than 700 mi of new transmission infrastructure under what is expected to be the largest transmission expansion in the upper Midwest in 30 years. The projects include three proposed 345-kV transmission lines and one proposed 230-kV transmission line
.
The CapX2020 lead utilities are working toward agreement frameworks for the initial projects during first quarter 2011. The first phase of the CapX2020 construction work will be performed by Quanta Services' M.J. Electric operating unit and MYR Group's MYR Transmission Services, Inc. ("MYRT").

The construction projects will be assigned to each contractor over the next five years. The first contract, for the Bemidji-Grand Rapids project, is expected to be signed between M.J. Electric and CapX2020 by the end of first quarter 2011. Under the proposed agreement, M.J. Electric will install approximately 70 mi of 230-kV transmission line between the Wilton Substation near Bemidji, Minnesota, and the Boswell Substation in Grand Rapids, Minnesota. Construction is expected to begin in the summer of 2011 with a projected in-service date of late 2012.

The second contract, for the segment between St. Cloud and Alexandria, is expected to be signed between MYR Group's MYRT and CapX2020 in early second quarter 2011. Under the proposed agreement, MYRT will install approximately 60 mi of 345-kV transmission line between the Quarry Substation near St. Cloud, Minnesota, and the Alexandria Switching Station (future Substation) in Alexandria, Minnesota. Construction is currently scheduled to begin late fall of 2011 with a projected in-service date of 2013.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues