Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Million Dollar-Plus Power Upgrade for the Northern Sunshine Coast, Australia

ENERGEX is investing more than $13 million in the local electricity network and upgrading the company’s Noosaville Substation. The Noosaville Substation will be upgraded with a new 132/11-kV 60-MVA transformer, a new switchboard and a new capacitor bank. This equipment will be connected to the existing network. Work commenced in January and more than 13,000 local homes and businesses will benefit from the project which includes upgrading the Noosaville Substation, doubling the capacity.

The upgrade will ensure the local communities of Noosaville, Tewantin, Sunrise Beach, Sunshine Beach, Noosa Junction and Noosa Heads, including the Hastings Street tourism precinct, continue to have a reliable electricity supply into the future.

In addition to the substation upgrade, new underground power cables and associated electrical equipment will be installed in Noosa Heads on Upper Hastings Street, Allambi Rise, Little Cove Road and Pandanus Street. Overhead powerlines in this area will be removed to improve the visual amenity of the surrounding area.

This additional capacity will allow for current and future power usage in Noosaville and surrounding areas which according to ENERGEX’s North Coast Asset Manager Steven Lynch is increasing due to the swift uptake of energy intensive lifestyle products.

“As with most areas in South East Queensland affordable home air-conditioning and the installation of large screen televisions and similar consumer products have increased domestic power usage significantly,” Lynch said. “In fact, the average South East Queensland home now uses up to 70 per cent more electricity than they did just 10 years ago so it easy to see why ENERGEX is working hard to meet the community’s power needs.”

Lynch thanked local residents and motorists in advance for their patience during the necessary upgrade work and said the project is expected to be completed in early 2012.

In the past five years more than $340 million has been invested in the region with $42.5 million worth of substation projects recently completed and more than $70 million worth of projects either planned or already underway.

The project is part of a record $5 billion-plus, five-year capital expenditure program being undertaken by ENERGEX. In the 2010-11 financial year ENERGEX, South East Queensland’s electricity distributor, is investing around $1.02 billion on upgrades to its electricity network while a further $342 million-plus has been set aside to maintain and operate the network – that’s an overall average of more than $3.7 million a day.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues