Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines

Special Plan to Rebuild 115-kV Transmission Line Keeps Lines Energized Most of the Time

In mid-December Henkels & McCoy completed Phase One of the Plumtree to Triangle 115-kV Rebuild Project in western Connecticut for Northeast Utilities. The project is replacing 16, 115-kV lattice steel towers with 32 steel monopole structures. New conductor and OPGW (optical ground wire) over 1.8 miles of right of way (ROW) will be strung. Two new monopoles will replace each lattice tower. For the duration of the project, keeping the lines energized except for those times when it is absolutely necessary to have an outage to perform the work has presented a unique challenge. The lines had to be de-energized, for example, when conductors were moved from the old structure to the new poles, and when new conductor was being pulled in. But most of the time when the work was being done the lines had to remain energized.

The original lattice steel structures held three separate 115-kV circuits: Two circuits on the outer arms and one circuit in the center space. The rebuild project will replace these circuits with just two circuits comprised of heavier conductors which will be mounted one each on the two new rows of monopole towers. The original conductors were 397.5 kcmil ACSR and 556.5 kcmil ACSR. The new conductors will be 1272 kcmil ACSR. According to Henkels & McCoy construction manager Danny Ashmore, each lattice structure will be replaced by two steel poles: one slightly to the north of the existing structure on the same ROW and one slightly to the south of the existing structure.

Work started in July 2006, first with construction of the tower foundations on the north and south sides of existing structures; then with installation of the monopole towers on the north side only, all with the lines energized. Ashmore said, “In the final configuration there will be two monopoles with arms tipped in toward the existing lattice structure which will then be removed.”

To arrive at that final arrangement, however, a temporary line was needed. As Ashmore explains: “We built the north side towers with arms going out in both directions. Then we installed a temporary line on the furthest outside arms. Next we transferred the existing conductor from the lattice structure to the inside arms of the tower and removed the lattice structure arms (see photo). For safety reasons this move was done with the line de-energized. Now with the two lines installed on the tower, we can remove the center and south side lines from the lattice structures and dismantle them. In Phase Two, we will build the south side monopole towers, install the south side lines, and then remove the temporary lines on the outside of the north towers.”

Safety is a prime concern for the contractor on this project, so potential safety problems and danger areas were identified and appropriate work procedures developed. In addition, Ashmore explained, “We have a special safety plan with respect to the demolition of the lattice structures because of constraints such as terrain and the fact that the line traverses residential neighborhoods.”

Work is expected to be complete by spring 2007.

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues