Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Vattenfall Service Nordic Ab to Construct Submarine Cable between Finland and Sweden

Fingrid and Svenska Kraftnät have chosen Vattenfall Services Nordic Ab to construct the 500-kV high-voltage direct current line between the Dannebo and Finnböle substations in Finland. The construction of the transmission line is part of the Fenno-Skan 2 submarine cable project between Finland and Sweden, due to be ready at the end of 2011.

Fenno-Skan 2 will be an 800-MW and 500-kV electricity transmission connection between Finland and Sweden. The total length of the link will be approximately 300 km, of which the actual submarine cable will account for some 200 km.

The submarine cable will be connected to the Finnish transmission grid at the Rauma substation. In Sweden, the connection point to the Swedish grid is the Finnböle substation, which is not situated right on the coast. This is why a direct current transmission line of 70 km needs to be built in Sweden from Dannebo on the coast to Finnböle north of Stockholm. Vattenfall Services Nordic Ab has been chosen to construct this line. The price for the line in Sweden is approximately 23 million euros. The entire cable project will cost 300 million euros.

The submarine cable connection will be implemented jointly by transmission system operators Fingrid Oyj and Svenska Kraftnät in Finland and Sweden respectively. Fenno-Skan 2 will improve the electricity transmission capacity between Finland and Sweden by about 40 per cent, integrating the Nordic electricity market even more closely together. In practice, the cable link will reduce temporary price variations of electricity between the various countries in the electricity market. The cable will also reduce the risk of a serious disturbance and supply interruptions, and decrease transmission losses.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues