Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

WMECo Starts Construction on the Greater Springfield Reliability Project

Western Massachusetts Electric Co. (WMECo) has broken ground for the Greater Springfield Reliability Project, a $795 million transmission upgrade designed to strengthen the region’s power grid, meet mandatory reliability standards, and allow power to move more freely around the greater Springfield and north-central Connecticut area.

Construction on the Greater Springfield Reliability Project has started at the new Cadwell Switching Station in Springfield, Mass., and at the existing Agawam Substation in Agawam, Mass. Construction of the overhead transmission line in Massachusetts is expected to begin on existing rights-of-way in early 2011.

“In addition to its reliability benefits, this project supports the region’s economic health by improving access to markets for electric suppliers and enhancing access to lower-cost and renewable energy resources,” said Peter Clarke, President and Chief Operating Officer of WMECo.

Construction on the Greater Springfield Reliability Project is expected to create more than a thousand jobs at the peak of construction while adding about $11 million in much-needed tax revenues to towns along the project route.

The project includes work along 39 mi of an existing transmission right-of-way between Ludlow, Mass., and Bloomfield, Conn. The 27-mi portion in Massachusetts includes new 345- kV transmission lines, new and reconstructed 115-kV lines, two new switching stations and several substation upgrades.

In Connecticut, construction is expected to begin with a substation upgrade in Bloomfield in mid-2011, and construction of the overhead line is expected to begin in late 2011.

The project is expected to be in service in 2013.

Greater Springfield Reliability Project is one of four transmission projects called the New England East-West Solution (NEEWS). Together these projects strengthen the reliability of the power grid within the regional transmission system by ensuring that national and regional reliability standards are met.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues