Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

DOI Approves Transmission for Solar Thermal ‘Power Tower’ Project in Southern California

Secretary of the Interior Ken Salazar has approved a transmission line, access road and substation on public lands that will connect a 150-MW solar energy project to the power grid in California. The proposed project, Rice Solar Energy Project, will be built on private land in Riverside County and, when constructed, the facility is expected to power 68,000 homes, create up to 450 jobs, and generate more than $48 million in state and local tax revenue over the first 10 years of operation.

Proposed by Rice Solar, LLC, a subsidiary of SolarReserve LLC, the thermal “power tower” facility will be located on 1,410 acres of previously disturbed private land near Blythe. The above-ground 230 kV transmission line that crosses eight miles of land administered by the Bureau of Land Management (BLM) will connect with the Western Area Power Administration's Parker-Blythe #2 transmission line. The project’s innovative molten salt storage system can capture solar energy and deliver power to the grid even after the sun goes down.

The project has undergone extensive environmental review and reflects strong efforts to mitigate potential environmental impacts. SolarReserve will be required to fund the acquisition and enhancement of 1,522 acres to compensate for impacts to desert tortoise habitat on private and public land.

“Mitigation is a key priority for us as we stand up renewable energy across the country,” said BLM Director Bob Abbey. “In addition, this project will be on an abandoned airfield near Blythe. By siting it on already disturbed land, we are able to do something the public has told us is a priority -- avoiding impacts to undisturbed areas in the desert.”

Salazar’s signing of the Record of Decision for this project is the latest in a series of solar, wind, geothermal and transmission facility approvals resulting from Interior’s renewable energy program. This priority approach to renewable energy development on public lands processes existing applications in a coordinated, focused manner with full environmental analysis and public review.

In the past two years, this approach has enabled Interior to approve 22 major renewable energy projects, including 13 commercial-scale solar energy facilities that combined will create about 8,600 construction and operational jobs and produce nearly 5,000 megawatts of energy, enough to power approximately 1.5 million American homes.

The Rice Solar Energy Project is one of the projects jointly processed through the BLM and the California Energy Commission cooperative model. It was licensed by the Commission on December 15, 2010. The Western Area Power Administration has served as the lead NEPA agency reviewing the project, with BLM as a cooperating agency.

Because the development on private land is connected to the federal Right of Way for the transmission line and cannot proceed without Interior approval, the Environmental Impact Report/Environmental Assessment had to consider the impacts of the entire generation and transmission project, including the components located on private lands.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues