Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Oregon Public Utility Commission Acknowledges PGE Resource Plan

The Oregon Public Utility Commission has granted final acknowledgement to Portland General Electric Co.'s 2009 integrated resource plan. The plan outlines strategies to meet PGE customers’ electricity needs over the next 20 years, with a four-year action plan for acquisition of new resources to begin implementing those strategies. The plan is the result of two years of analysis, research and public debate, including extensive input from customer advocates, regulators, energy experts, and other key stakeholders.

“This represents a major milestone for PGE, our customers and Oregon’s energy future,” said Jim Piro, president and CEO. “This plan responsibly addresses the future energy needs of our customers and strikes a sensible balance between customer costs and risks and environmental impacts and sustainability. It also provides a reasonable transition time for moving away from coal to other sources of energy supply.”

The four-year resource acquisition plan targets:

  • All energy efficiency measures identified as achievable by the Energy Trust of Oregon – 214 average MW – which PGE expects will meet nearly half of PGE’s load growth through 2020.
  • 122 average MW of additional renewable resources to meet Oregon’s renewable energy standard requirements on or ahead of schedule.
  • Demand-side resources – measures customers can take that can reliably deliver short-term reductions in customer demand to help reduce capacity needs and manage loads during peak periods.
  • Additional natural gas-fired generation with state-of-the-art turbines and pollution controls to serve existing demand, meet additional load growth and maintain reliability standards. This would include 300 to 500 megawatts of baseload capacity and 100 to 200 megawatts of flexible peak load resources.
  • Short-term and mid-term market purchases.
  • Installation of emissions control retrofits on PGE’s coal-fired generating plant near Boardman, Oregon, to comply with Regional Haze rules under the Clean Air Act. The commission acknowledged PGE’s 2020 plan for the plant, which calls for the initial control retrofits followed by an end to coal-burning at the plant by Dec. 31, 2020. This action is contingent on approval of the 2020 plan by the EQC, which is slated to act on the proposal later this year.
  • New transmission capacity to help meet growing energy needs, allow for development of more renewable power projects, and enhance reliability of the electrical grid. PGE has proposed development of a new transmission line called Cascade Crossing, which would bring power generated east of the Cascade Mountains to the Willamette Valley near Salem, Oregon.

The integrated resource planning process, which follows guidelines established by the OPUC, is designed to identify a future portfolio of resources that offers the best combination of cost and risk, taking into account factors such as environmental impacts, fuel supply availability, price volatility, resource diversity, and the ability of available resources to reliably meet demand. Utilities issue integrated resource plans roughly every two years to reflect new technologies, market conditions, and regulatory requirements.

PGE filed its 2009 integrated resource plan with the OPUC in November 2009 and then filed an addendum in April 2010 updating its plans for the Boardman plant. The company will now develop requests for proposals, under the OPUC's competitive bidding guidelines, to seek additional renewable and natural gas-fired generating resources called for in the four-year action plan.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues