Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

U.S. Department of Energy Earmarks $5 Million for ComEd Smart Grid Solar Pilot

Last week the U.S. Department of Energy announced that ComEd could receive up to $5 million in American Recovery and Reinvestment Act (ARRA) funding for the utility's Smart Grid solar pilot. This one-year project would examine customer responses to pricing signals, the impact of renewable distributed energy system, and how they can best be integrated into a future Smart Grid system.

ComEd's solar pilot would include approximately 200 customers, most of whom would be among the first 140,000 ComEd customers to receive a new smart meter through ComEd's proposed Advanced Metering Infrastructure (AMI) pilot, which currently is under consideration by the Illinois Commerce Commission. A smart meter is a digital electric meter that collects usage information every 30 minutes and sends that information to ComEd through a secure telecommunications connection.

A group of customers in the pilot would receive solar photovoltaic systems, some with energy storage capability, and be placed on a real-time electricity price and net metering program which lets customers get credit for excess electricity generated by their solar energy systems that goes back to ComEd's grid. Other customers in the pilot will receive only an energy monitoring display.

ComEd's Smart Grid solar pilot will: 

  • Study how integration of photovoltaic panels and energy storage into  AMI systems will affect reliability of the distribution system. 
  • Observe and evaluate the way consumers engage with technology and  respond to price signals during peak and non-peak demand times. 
  • Assess customer attitudes toward adopting new and emerging  technologies.

The estimated award to ComEd for the solar pilot is $5 million, but the final grant amount is pending negotiations between ComEd and the DOE on project details. Acceptance of the grant is also contingent on approval of ComEd's AMI pilot proposal.

Pending these approvals, the pilot would begin in early 2010. Four groups of customers will be selected from customers located within the AMI pilot footprint, which includes nine towns serviced by its Maywood operating center and the Humboldt Park area in Chicago. .

Partners on the ComEd pilot include the Illinois Sustainable Technology Center, which will survey participants to assess attitudes toward adopting new/emerging technologies; Argonne National Lab for data gathering and analysis; and GridPoint for battery storage systems and photovoltaic and energy monitoring.

Grant funding would come from the American Reinvestment and Recovery Act of 2009 (ARRA), of which $117.6 million is allocated for disbursement by the DOE in support of innovative solar energy technology proposals.

Separate from this application, ComEd also applied for $175 million in ARRA federal stimulus funding to more than double the AMI pilot project and expand investment in other advanced automation technology to make the transmission and distribution systems "smarter" and more reliable.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues