Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Russian National Grid Operator to Develop Energy Storage Systems

The Russian Federal Grid Co. will develop storage systems under a nationwide grid modernization program. An equipment-supply, business and technical consulting contract has been signed with Ener1 for $40 million. The Russian government has funded the update of the country’s power transmission infrastructure at a level of $15 billion through 2012.

The initial phase of cooperation is underway and scheduled for completion in Q2 next year. It focuses on grid integration of large-scale emergency power back-up systems in economically critical regions, specifically the Black Sea port city of Sochi, selected as the official site of the XXII Winter Olympic Games in 2014. Installations are being custom designed for exacting operational conditions and placement at remote grid substations in the Western Caucasus Mountains ski resort Krasnaya Polyana. The purpose is to maximize reliability of the power supply for Olympic events.

The supply contract was signed with state-run FGC’s wholly owned subsidiary Mobile GTES, a Russian manufacturer of mobile electric power stations. In addition to the design and manufacture of the specialized Sochi energy storage units, the contract includes two in-depth joint studies involving Ener1 and FGC engineers covering:

  • System-wide assessment for deployment of lithium-ion storage for applications including strengthening the grid in remote regions, peak load-shaving and future integration of intermittent renewable power sources such as wind.
  • Feasibility of localization within Russia of development and manufacture of lithium-ion battery cells and other components for energy storage systems.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues