Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

FERC Takes Steps to Support Continued Reliability of Electric Grid

The Federal Energy Regulatory Commission (FERC) took steps to support continued transmission system reliability by proposing revisions to eight critical infrastructure protection reliability standards that include a new method of identifying cyber assets that are critical to the nation’s bulk power grid.

The proposed “Version 4” CIP standards are an interim step, FERC said in directing the electric industry and the North American Electric Reliability Corp. (NERC) to continue developing a comprehensive approach to assure the grid can withstand a cyber security incident. NERC is the Commission-certified electric reliability organization responsible for developing and enforcing mandatory reliability standards.

The new standard would replace the existing risk-based assessment methodology for identifying critical assets with 17 uniform “bright line” criteria, making the process more consistent and clear by limiting discretion in the identification of such assets.

Today’s notice of proposed rulemaking (NOPR) stressed that NERC has not addressed all the modifications directed by the Commission’s Order No. 706, which approved the original CIP standards in January 2008. The NOPR would require NERC to make a filing to fully comply with Order No. 706 by the end of the third quarter of 2012. Comments on the proposed rule (RM11-11) are due 60 days after publication in the Federal Register.

In other reliability orders, FERC issued final rules approving NERC’s interpretation of:

  • Transmission Operations Reliability Standard TOP-001-1 on the restoration of real and reactive power during a system emergency (RM10-29). The final rule agreed with NERC’s view that the balancing authority is responsible for restoring real power balance and the transmission provider is responsible for restoring reactive balance during a system emergency.
  • Transmission Planning Reliability Standard TPL-002-0 addressing system performance following loss of a single bulk electric system element (RM10-6).

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues