Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

FERC Takes First Step in Smart Grid Rulemaking Process

The Federal Energy Regulatory Commission has taken the first step in starting a formal rulemaking proceeding involving the five groups of smart grid standards identified by the National Institute of Standards and Technology (NIST) as ready for consideration.

The NIST standards are the first of what may be several hundred more to be identified for FERC consideration in the coming years. NIST handed off the first standards to FERC under Section 1305 of the Energy Independence and Security Act of 2007 (EISA), which requires FERC to adopt in a formal rulemaking proceeding standards and protocols necessary to ensure smart grid functionality and interoperability in interstate transmission of electric power, and regional and wholesale electricity markets.

FERC has created a docket, RM11-2-000, for this rulemaking, and in the near future will issue a Notice of Proposed Rulemaking (NOPR) that will include opportunity for public comment.

According to NIST, the suites of smart grid standards will:

  • Provide a Common Information Model necessary for exchanges of data between devices and networks, primarily in the transmission (IEC 61970) and distribution (IEC 61968) domains (the IEC numbers reference two related groups of standards);
  • Facilitate substation automation, communication and interoperability through a common data format (IEC 61850);
  • Facilitate exchanges of information between control centers (IEC 60870-6); and
  • Address the cyber security of the communication protocols defined by the preceding IEC standards (IEC 62351).

EISA does not authorize FERC to require compliance with the final standards; however, FERC may consider requiring compliance with the standards under its Federal Power Act authorities.

The summaries of the smart grid standards are available on FERC’s eLibrary under Docket No. RM11-2-000. There will be an opportunity for public comment on the standards only after FERC issues the NOPR in this case.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues