Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Turkey to Connect with the European Grid, Expanding Energy and Economic Opportunities

Turkey will connect to the European electrical grid this September using smart grid technology, allowing for expanded energy and economic opportunities. The Turkish Electricity Transmission Company (TEIAS) will now be able to buy and sell power in the European electricity market, and the connection should help strengthen the reliability and availability of energy throughout all of Europe.

"The territory serviced by ENTSO-E (European Network of Transmission System Operators for Electricity) is one of the highest demand regions for energy in the world,” according to a report issued in 2009 by the Ministry of Energy*. “The energy policies of ENTSO-E’s countries are driving a single market model through the synchronization of more networks, thus increasing the reliability of the supply of electricity to maximize the efficiency of generation, transmission, distribution and consumption of energy while minimizing environmental impact.”

Connecting Turkey with the rest of the European grid is an important step to help meet these initiatives. The cross-border system may also enable a new, cleaner energy mix for Europe. There is a demand for renewable energy in European countries, and Turkey has massive renewable energy sources, which makes this new relationship mutually beneficial to both TEIAS and ENTSO-E.

GE’s smart grid communications and wide-area protection solutions will monitor grid status at the points of connection and automate the control of generation and load within Turkey. The system will optimize power sharing and power quality while improving reliability and preventing cascading outages.

GE completed the engineering for the system in a matter of months. Currently in the final phases of testing, GE’s wide-area protection solutions should enable the first inter-connection of Turkey’s and European grids in September

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues