Shave and Save
Pee Dee Electric Cooperative recovers its SCADA investment many times over with savings generated by load control and peak shaving.
A small rural electric utility is doing its part to reduce peak system demand at every rate-class level. Pee Dee Electric Cooperative Inc. (PDEC) serves approximately 30,000 customers, or cooperative members, in six counties of northeastern South Carolina. Industrial accounts are encouraged to peak shave by the rate on which they are placed, which bills on coincident peak demand. Residential and commercial members are encouraged to switch to time-of-use (TOU) rates that, if properly used, can save members and the cooperative money on their power bills. Demand in all rate classes is also reduced by peak shaving voltage reduction. PDEC refers to this program in its entirety as the load control program.
PDEC does not generate electricity; therefore, it pays a power bill each month just like its members. The bill paid by the cooperative has an energy component — a simple accumulation of kilowatt-hours — similar to every house on the system. However, there is also a component of the monthly invoice based on the utility's metered demand during the 60-minute interval of the statewide monthly peak, also called the coincident peak demand. Predicting when this peak will occur is not an exact science, but — by keeping up with weather trends and historical temperature data — a great deal of peak-predicting success has been realized. Any load that can be removed from the system during the time of this peak leads to direct savings on PDEC's monthly invoice. As a not-for-profit utility, this cooperative passes any savings on to its members in the form of capital credits.
Wholesale Rate
PDEC's 25 largest members, who account for approximately 20% of the system demand, pay for their electricity on a wholesale rate with a structure identical to the one the cooperative itself pays. Because these members have access to the same coincident peak demand rate savings, any load shedding they practice yields a direct savings on their invoices while reducing burden on the system during peak conditions.
Time-of-Use Rate
Savings opportunities are not limited to the wholesale rate members. The rest of the system is eligible for a TOU rate. Depending on the size and rate class of the service, two different TOU rates are available. For commercial and large power services, a demand-based rate is available that has a structure similar to that of the wholesale rate. For smaller members (mostly residential), the TOU rate simply charges different prices per kilowatt-hour depending on the time of day and the season.
A plot of system peak hours shows that a large majority of the winter peaks occur during the hours ending 7 a.m. and 8 a.m. A few occurred during the hour ending 9 a.m. For this reason, the peak time on the TOU rate during winter months is from 6 a.m. to 9 a.m. when a premium is charged per kilowatt-hour. For the other 21 hours of the day, members actually get a discount compared to standard rates (not time-based).
Summer peaks are harder to predict. While a great number of them occur in the hour between 4 p.m. and 5 p.m., it is possible to have a summer peak as early as the hour ending 2 p.m. and as late as the hour ending 7 p.m. (Note: In the figure on page 43, the two peaks at the hours ending 8 p.m. and 9 p.m. were winter peaks.) The peak window — when the TOU rate is billed at a premium — during summer months is from 2 p.m. to 7 p.m.
PDEC's system now has 100% automated meter reading (AMR) coverage, using Aclara's TWACS technology, so any rate changes implemented have to be backed up with the appropriate meter/module packages. For these smaller services, Landis+Gyr's FOCUS AX TOU meter is used with Aclara's UMT-R FX module. For the accounts requiring demand monitoring, Landis+Gyr's S4e meter family is used with Aclara's CMT module.
Of course, meters and AMR modules with these capabilities cost more than the average package. PDEC deals with this added cost by increasing its monthly member-owner charge — the cooperative's term for a customer charge or facilities charge — by enough to recover the extra cost in two years. Even with this higher charge, the rates are structured to save members from US$15 (smaller accounts) up to more than $1000 (large power accounts) per month if the member takes part in the advised load shifting and shedding.
Voltage Reduction
In addition to offering rates that encourage members to shave load during peak conditions, PDEC directly reduces system demand by lowering substation feeder and bus voltage. Although PDEC has 34 substations, with an average of three to four circuits each, the cooperative uses very few down-line regulators, with only 10 banks on the entire system. Furthermore, even fewer capacitors are used with only six banks in operation. For these reasons, any voltage reduction implemented at the substation level impacts the entire system.
There are three types of load on the typical grid, and they all have different responses to voltage reduction:
-
Constant-current loads draw the same amount of amps over a range of operational voltages, within certain limits. For these loads, a 3% reduction in supply voltage — PDEC's normal target — yields a 3% reduction in demand.
-
Constant power loads draw the same amount of kilowatts and kilovolt-amperes over a range of operational voltages. Reducing the supply voltage of these loads by 3% has no impact on load demand.
-
Constant impedance loads force current and voltage to maintain a certain ratio (because of Ohm's law: Z = V/I). Therefore, if voltage is reduced by 3%, current also must be reduced by 3%. This reduction is squared in the power equation, yielding nearly a 6% reduction in demand (97% × 97% = 94.09%).
Every utility's system has a mixture of these three load types. The blended average impact of voltage reduction depends on the concentration of each type on a system. PDEC uses supervisory control and data acquisition (SCADA) applications provided by Advanced Control Systems to lower substation bus and feeder voltage and to monitor the impacts these changes have on system demand. PDEC's engineers have written a program using Advanced Control Systems' Applix spreadsheet function that enables them to monitor real (kilowatt) and reactive (kilovolt-ampere-reactive) load for any given time period in 5-minute intervals for any substation or group of substations.
Want to use this article? Click here for options!
© 2012 Penton Media Inc.
Acceptable Use Policy
Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.