Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

Blogs

  • 2010 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2010 PES Expo in New Orleans, LA, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Grant Helps Install More Than 150 Smart Grid Measurement Units in Midwest ISO

The Midwest ISO has launched a three-year program to install more than 150 high-tech monitoring devices that will monitor the state of the electrical grid 30 times each second, increasing the efficiency and reliability of power delivery. Midwest ISO is the first regional transmission organization (RTO) to move forward and execute an agreement with the U.S. Department of Energy to implement synchrophasors, also known as phasor measurement units (PMUs), to more accurately measure voltage and current within the Eastern Interconnection.

"This is a major step forward toward developing a smart grid system in the Midwest," said John R. Bear, president and CEO of the Midwest ISO. "Synchrophasors will bring a new level of measurement to the grid, similar to what the MRI has done for diagnostic medicine. We will be able to view vital measurements at strategic points along the interconnected transmission network at a level that was previously impossible to reach."

The project will potentially provide several commercial benefits for Midwest ISO members. PMU measurements could increase available transmission for Midwest ISO members and improve system-wide reliability and stability. This could ease the integration of highly-variable sources of energy, such as wind, onto the grid.

"We build in a buffer zone to ensure that variations in energy delivery do not impact the stability of the system and overload our transmission wires," said Bear. "Now, we’ll be able to decrease the size of that buffer zone, and use more of the available transmission to deliver more power more efficiently. And, we will be able to do this without increasing risk or decreasing reliability."

PMUs are an essential part of a national effort to modernize and connect the grid. Synchrophasor measurements are collected 30 times every second, as opposed to the current once every four seconds, and the data is GPS time-stamped. This allows the data to be ‘synchronized’ and used to create enhanced grid visualization, operational awareness, stability monitoring, state estimation, and after-the-fact analysis.

The planned roll-out and installation of PMUs within Midwest ISO’s membership area will occur during the next three years. The first phase of the project, which began today, involves transmission owners placing 15-20 PMUs at strategic substations throughout the Midwest ISO footprint. After the pilot period, transmission operators will install the remaining PMUs between August 2011 and March 2013.

"We are excited about moving forward with deploying the PMUs enabling increased operational efficiency and reliability," said Roger Harszy, vice president of Real Time Operations. "The PMUs will provide better indications of grid stress and will facilitate operators to be even more proactive when corrective adjustments are necessary."

The installation and development of PMUs are supported by a $17.3 million Department of Energy grant, which was finalized and approved today by the Smart Grid Investment Grant (SGIG) program. These funds make up half the $34.5 million budgeted for implementing PMUs across the Midwest ISO. About $25 million is budgeted for transmission owners to install the devices, with the remaining funds targeted for equipment and software to receive and process data, as well as research on the program.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

Most Read


Find Other Popular Items

Features

Vegetation Management
Vegetation Management

Podcasts

» More Podcasts

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available durning their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.

  • Coming soon....

On-Demand Webcasts

» View More Webcasts

Jobzone
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue
  • October 2011 Issue
  • September 2011 Issue
  • August 2011 Issue
  • July 2011 Issue

Browse Back Issues