Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Siemens/CEPEL Consortium to Supply New Energy Management Systems to Brazil

Siemens Energy and CEPEL, the Brazilian Electrical Energy Research Center, are to supply new energy management systems (EMSs) to the Brazilian grid operator ONS.

Having secured the contract for the REGER project in the face of stiff international competition, the task ahead of the Siemens/CEPEL consortium will be the implementation of a standardized monitoring and control platform at four different locations. With the Siemens/CEPEL solution it will be possible to provide flexible, real-time monitoring and control of Brazil's national power transmission network. Four EMSs will, in the future, enhance the reliability and performance of Brazil's power-supply network. These systems will be installed at the National System Operation Center CNOS in Brasília and at three regional operation centers in Florianópolis, Recife and Rio de Janeiro.

With the new systems, ONS will have the advantage of an integrated operating mode, which will enable access to resources and reciprocal support between the four control centers. The project's central innovative feature is the Evergreen concept. Combining field-proven products such as the Siemens Spectrum PowerCC Information Model Manager and CEPEL's SAGE means that the consortium will be able to continuously update REGER and that ONS will remain competitive over the entire system lifecycle. The project will be executed in two phases lasting 30 and 48 months, respectively.

The international experience accumulated by Siemens with highly complex smart grid projects and CEPEL's local R&D competence in the field of EMS will provide ONS with the investment security needed for a project of this magnitude.

Visit w1.siemens.com for more information.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues