Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Siemens Develops Distribution Feeder Automation System Via WiMAX

Siemens has embarked on a road to develop a high-speed, decentralized distribution feeder automation system that expands its distribution automation portfolio.

The decision to move in this direction was based on three major requirements: a future-poof solution that uses only recognized communication standards; a system that must provide high-speed fault location to start rapid feeder reconfiguration; and a system that must be scalable to provide cost-effective applications from a source-transfer application for a critical load to a fully automated Fault Location Isolation and Service Restoration (FLISR) system.

The following technologies were chosen to form a base for the solution:

  1. The IEC61850 communication protocol with peer-to-peer capability forms the basis for all data communication between devices.

  2. WiMAX was chosen as a platform for the IEC61850 systems based on its high-bandwidth and long-haul capabilities. The RuggedComm RuggedMAX Hardened Wireless Broadband WiMAX system was chosen for this solution.

  3. The protection relay selected was the SIPROTEC 7SJ80 with high-speed PLC functionality.

Siemens had no problem finding a partner to deploy such a system in a pilot project. The partner, A&N Electric Cooperative, serves customers on the eastern shore of Virginia, U.S. Kelvin Pettit, vice president of system reliability, and Tom Larson, vice president of engineering, immediately realized the power in the scalability of this system. According to Pettit, A&N needed a cost-effective solution to address its need for automation of some critical loads. A&N had a distribution feeder in its network feeding a critical hospital load that was controlled manually. An outage caused by a fault in the connected feeder could lead to a long outage before the system could be reconfigured to supply power to the hospital from an alternate substation source.

Deploying the new system would provide A&N with an automated, high-speed solution for the transfer of substation sources 20 miles (32 km) apart to feed this critical load. In addition, the system would provide high-speed FLISR functionality to this feeder, greatly enhancing reliability.

According of Andre Smit, senior product development manager for Siemens, faults are detected in less than 0.1 sec and automation-switching sequences on this feeder are completed in less than 0.4 sec. “We are confident that A&N's customers will not even be aware that switching was performed to optimize the feeder and to keep the maximum number of customers connected to a stable supply of power.”

For more information, visit www.energy.siemens.com.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues