Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Energy Boost for Ausgrid’s Crows Nest Substation

Work is set to begin on the electrical fit out of the new Crows Nest zone substation, with two 50-ton transformers arriving on site this month. Ausgrid General Manager Transmission Trevor Armstrong said the construction of the new substation building was on track to be completed by the end of the month allowing the electrical work to begin.

“The existing Crows Nest substation was built in 1930,” Armstrong said. “It has performed well, but it is now time for much of the equipment to be replaced or upgraded.”

The new substation building is a modern, architect-designed building next door to the existing substation. When commissioned it will supply power to more than 15,000 homes and businesses in parts of Crows Nest, Cammeray, North Sydney, Wollstonecraft, Neutral Bay, Waverton, Naremburn, St Leonards and Cremorne.

“Peak demand for power is growing at about 1.4% a year across the North Shore region. As we replace key substation equipment we are also making sure it has enough capacity to help meet these peaks. We are converting the substation from carrying 33-kV equipment to 132-kV equipment, so it will play an important role in getting electricity to homes and businesses in the area," Armstrong said.

Specialist substation technicians will work at the substation to complete the fit out. This includes the installation of:

  • two 50MVA transformers
  • 44 control and protection panels; and
  • six bays 132-kV gas insulated switchgear that will be delivered in May next year.

“About 150 cable jointers, substation technicians, engineers, builders and other workers will have worked on site by the time the project is complete,” Armstrong said.

Once the electrical fit out is complete at Crows Nest, crews will focus on the installation of replacement underground high voltage cables which will connect the substation to the supply point at Willoughby and onto a new substation at North Sydney. Major works on the substation site will be completed late next year.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues