Resources

On Demand Media

Demand Viewing

Transmission & Distribution World On Demand events allow you to access archived webinars when it is convenient for your schedule. These free events are available for viewing 24/7.

White Papers

Designing Energy Services for Commercial and Industrial Customers

Over the past year, technology advances and high energy prices have stimulated interest in Advanced Metering Infrastructure (AMI). Discussions are wide-ranging. Some focus globally: Australian and Canadian “smart metering”, new European Union requirements, the results of time-of-use pilots that arose in the wake of California’s deregulation debacle.

More White Papers

Marketplace Ads

  • Trip Wire

    Automate NERC Cyber Security Compliance

  • Ike Blog

    Reports From The Front

Case Studies

York Region Finishes Tasks Faster

We all know that data integration improves productivity and York Region is living proof. Using AutoCAD® Map 3D, York saved time and money by relying on its AutoCAD-trained staff to quickly implement a new system that incorporates both CAD and GIS.

Save Time with CAD and GIS Integration

Read how the Public Works Department of the City of Tacoma (Tacoma), Washington, uses its geospatial data to do everything from issuing building permits and managing waste water to maintaining streetlights


         Subscribe in NewsGator Online   Subscribe in Bloglines  

Southwest Baghdad Electricity Substation Adds Stability

Businesses and residences of southwest Baghdad will soon benefit from the recent completion of electricity transmission lines and the energizing of a major substation today.

The al-Rasheed 400-kV substation was energized May 28, 2008, on the 400-kV electrical grid only a few days after the Iraqi Ministry of Electricity completed the hook up of a new 11 km 400kV transmission line to the station.

"While this is not a generation station, it will however increase reliability of power for all people in southwest Baghdad," said Navy Lt. Cmdr. Andrew Johnson, Gulf Region Division government lead for electricity transmission and distribution projects in Iraq. "It will connect them directly to the 400kV grid and it is a much more reliable, much more stable source of power than what they are used to having."

Johnson said the energizing of the substation is a tremendous example of partnership. "I think that it's awesome," he said. "It's a success story of interaction between the Government of Iraq's Ministry of Electricity and the Army Corps of Engineers where the two sides work together and come to a common point at the point in time when they are supposed to. I think it is one of the success stories of the reconstruction of Iraq."

Johnson explained that a substation converts electricity from one voltage level to another. In the case of the al Rasheed 400kV substation, modern Gas Insulated Switchgear in the facility protects the new transmission lines while new transformers "step down" the 400 kV power from the transmission lines to 132 kV for distribution to southwest Baghdad. In those neighborhoods power is stepped down further by transformers to the consumer level of 220 volts, 50 amperes.

Johnson said reliability, from the perspective of the consumer, is having power when you expect to have power, but that service in Iraq will remain well below the western standard of 24 hours of power a day for several more years. Only lines feeding essential services such as hospitals, police stations and water and sewage facilities, are energized around the clock due to limited generation capacity.

"While we are not able to bridge the difference in [generation] capacity and demand...we can at least guarantee them that 40-50 percent of their day they will have power, rather than the 10 or 20 percent that they are having now," he said.

Across Iraq, the construction of new, dependable electricity transmission and distribution lines, substations and transformers goes hand in hand with increasing electricity generation in gradually improving the extremely underfunded, antiquated electric grid.

"This is a brand new substation with brand new transmission lines coming out of it...this will be an increase in capacity for transmission of power to their homes, and on a day to day basis they will see more electricity for longer periods," Johnson said.

Maj. Timothy Reed, Civil Affairs Officer for the 1st Brigade, 4th Infantry Division operating in southwest Baghdad, said Soldiers on the street do see an impact after completion of reconstruction projects. "The big thing is people are more satisfied when things get done, when they have more electricity they are more welcoming. You'll see more people come out and greet you," Reed said. "It's always a great time to go out and meet the people and shake the hands. Because you know you are doing the right thing, they know you are doing the right thing. They are more open to you. They are more willing to give you more tips when you show that you provide for them, they will provide for you."

Work on the almost $38 million Iraq Relief and Reconstruction Fund project began April 15, 2006. Although a new substation, the project was actually a rebuild of a previous effort.

Construction of the substation originally known as Baghdad Central 400kV substation began under the Oil for Food program in 2001 but was abandoned in 2003 when approximately 80 percent complete.

In the aftermath of the downfall of Saddam Hussein's regime, the substation suffered heavy looting and all moveable and readily re-usable equipment was stolen. The buildings also suffered extensive damage and most low voltage and control cables were stripped. All protection and all 400kV and 132kV control cubicle panels were damaged beyond repair, according to reports.

Starting essentially from scratch, the project installed the 400kV Gas Insulated Switchgear and 400kV Air Insulated Switchgear for four overhead line bays and four 250MVA transformer bays that are configured as a dozen -- 400/132kV 83MVA single phase auto transformers and an additional spare.

Also included in the project was the 132kV Gas Insulated Switchgear rehabilitation, replacement of the 11kV switchgear, low voltage switchgear, low voltage cables and control cables; and refurbishment of all buildings and building services for the facility.


Commenting terms of use

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

Want to use this article? Click here for options!
© 2008 Penton Media Inc.

Most Read

Community

Hurricane Ike Coverage

Hurricane Ike Coverage
On September 12th, Hurricane Ike tore through the Gulf Coast, wreaking havoc on lives and property. Transmission & Distribution World’s Rick Bush is headed to the region to provide a first-hand account of the damage including an insider view of utility emergency-response efforts. His reports and subsequent feature coverage will highlight how utilities, contractors and suppliers work as a team to restore power as quickly as possible.
Read Rick’s Blog, Ike: Reports from the Front

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

Webcasts

ACSS and HS285 Extend Grid Capacity

Sponsored by Southwire

There are capacity bottleneck situations, where new overhead transmission line construction is not a practical reality. In some of these situations overhead lines are in place and they are not able to provide the transfer capacity needed.

Register Now!


Supercondutor Cable Systems

Sponsored by American Superconductor

Transmission & Distribution World presents Superconductor Cable Systems, A Part of the Increasing Bulk Power Transfer Series.

Register Now!


Evolution of Next Generation Wireless Communications in Power Delivery

Sponsored by Alcatel-Lucent

Evolution of Next Generation Wireless Communications in Power Delivery - seeing wireless communications solutions emerge to enable more efficient operations.

Register Now!

More Webcasts

Featured Activity

T&D World University 2008

Get expanded education, practical experience and unprecedented networking in 3 days at T&D World University, the Continuing Education Program for Utility Management, Engineers and Technical Professionals. October 27-29, 2008, Dallas, TX. With CEU-Earning Seminars, Specialized Tracks, 59+ Courses, T&D allows you to maximize your time, with minimal work interruptions. Bring your team to this productive learning environment.

Jobzone
  • November 2008 Issue
  • October 2008 Issue
  • September 2008 Issue
  • August 2008 Issue
  • July 2008 Issue
  • June 2008 Issue
  • May 2008 Issue

Browse Back Issues