Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2010 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2010 PES Expo in New Orleans, LA, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Beijing Expands Power Grid for Olympics

A 22.1 billion yuan investment has increased Beijing's power supply by 33% to 68.9 million kilo-voltage amperes (kVA) to meet peak demand during the Olympic Games in August.

"Seventy more above 110 kV transformer substations were added to the power grid, bringing the total to 337," said Zhao Honglei, Beijing Municipal Electric Power Corporation spokesman, on Wednesday. "The maximum power supply was increased from 52 million kva to the current 68.9 million kVA."

In September 2006, Beijing invested 22.1 billion yuan (about 3 billion US dollars) in upgrading its electricity networks. The project was completed on Jan. 1.

"The power grid in Beijing is well equipped and able to resist heat, humidity, thunder and other extreme weather," said Zhao. "It will ensure a safe and stable electricity supply for the Olympic stadiums."

Zhao said the maximum power load during the games is expected to hit a record 14.6 million kW since the events coincide with the city's peak power demand in summer.

Electricity demand in Beijing fluctuates with climate change and the city greatly relies on power imported from other areas.

Air-conditioning use is believed to be the main cause of rising consumption during summer.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

Most Read


Find Other Popular Items

Features

Vegetation Management
Vegetation Management

Podcasts

» More Podcasts

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available durning their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue
  • October 2011 Issue
  • September 2011 Issue
  • August 2011 Issue
  • July 2011 Issue

Browse Back Issues