Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2010 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2010 PES Expo in New Orleans, LA, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

DOE Finalizes $43 Million Loan Guarantee for Flywheel Energy Storage Project

A $43 million loan guarantee has been finalized for Beacon Power Corp.'s 20 MW innovative flywheel energy storage plant in Stephentown, New York. The plant will help improve the stability and reliability of the state's electric grid and Beacon estimates it will create 20 construction jobs in New York and 40 permanent jobs in Massachusetts. Beacon Power is an energy storage company headquartered in Tyngsboro, Massachusetts.

Beacon's Gen 4 flywheel system is specifically designed to perform frequency regulation on utility grids by absorbing and discharging energy to balance power generation and consumption on the electric grid. The technology operates by using flywheels to quickly store and release from the grid in order to follow rapid changes in grid demand. Flywheel-based regulation is fast and efficient, ramping up or down 10 times faster than ramp rates for conventional fossil fuel generators that typically perform this service.

Beacon estimates that a 20 MW flywheel-based frequency regulation plant will reduce carbon dioxide emissions up to 82 percent over its 20-year life compared to a coal, gas or pumped hydro plant. The flywheel plant also does not emit air pollutants such as nitrogen dioxide or sulfur dioxide.

This is the second loan guarantee announced that will provide significant improvements to New York state's electrical grid. Last week the Department offered a $17.1 million conditional commitment to AES Storage for a project based in Johnson City.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

Most Read


Find Other Popular Items

Features

Vegetation Management
Vegetation Management

Podcasts

» More Podcasts

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available durning their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue
  • October 2011 Issue
  • September 2011 Issue
  • August 2011 Issue
  • July 2011 Issue

Browse Back Issues