Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

Ener1 and JSC Mobile GTES Sign Strategic Five-Year Agreement

Ener1, Inc. and Russia’s JSC Mobile GTES (MGTES) have signed a strategic framework agreement to manufacture lithium-ion-based uninterruptible power supply (UPS) systems as part of a five-year engineering and framework agreement. MGTES is a wholly-owned subsidiary of the Federal Grid Co. (FGC) of Unified Energy System.

Ener1 and MGTES previously signed a $40-million energy storage supply contract in November 2010. This new framework agreement follows a new Memorandum of Understanding (MOU) signed by both companies in March 2011. The purpose of the framework agreement is to set forth the parameters of what is contemplated to be a five-year supply arrangement. The effectiveness of the agreement is contingent upon specific conditions, including the parties negotiating and determining the number of units to be supplied, unit pricing, services to be provided, completion of a feasibility study, board of director approval by both companies, and finalization of other technical specifications.

The contemplated UPS systems are intended to provide near-instantaneous power back-up for FGC’s substation equipment to enable a more reliable bulk power transmission system. Coupled with Ener1’s battery management system, the UPS systems constitute a crucial element of FGC’s smart grid, which will enable electric power production, transmission and consumption to be controlled and optimized in real-time with a view toward ensuring maximum performance. MGTES would handle the on-site delivery, installation and subsequent operation of the UPS systems.

The proposed UPS systems -- which the companies anticipate will have an initial total capacity of 27.8 MW -- will provide back-up power for internal substation needs for one hour, including switchgear, lighting, communications and other needs. FGC believes this lithium-ion solution will have expanded capabilities beyond the company’s current lead acid solution, which is only able to back-up the switchgear for a short duration and does not provide back-up power for any other internal substation needs.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues