Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

NYISO Readies the Grid for More Wind

The New York Independent System Operator (NYISO) has introduced system and operating changes to better use New York States existing wind resources, and pave the way for continued growth of economical, emission-free, renewable power resources in the Empire State.

The enhancements, which were completed in September, help accommodate the variable nature of wind-powered generation with a centralized forecasting system.

A primary issue in the industry has been with forecasting the availability and timing of wind-powered generation. As the grid operator, we constantly adjust all generation supplies to meet the changing demand for electricity in real time, explained Steve Whitley, NYISO president and CEO. If the anticipated level of wind generation changes, then other adjustments must be made on the system to accommodate those changes.

The NYISO contracted with AWS Truewind, of Colonie, New York, to provide the NYISO with wind power forecasts for each wind power project, based on meteorological data and historical operating characteristics of the wind power projects. The data is fed directly into the NYISO operational systems that determine the balance of load and generation.

The NYISO is one of the first ISO/RTOs in the country to implement such a system. This forecasting method is considered best practice in the industry worldwide. The NYISO is supporting New York States leadership role in renewable energy by actively getting systems ready for wind development and integration.

As of Sept. 1, 700 MW of wind generating capacity was in commercial operation in New York State. Wind capacity in New York is projected to grow to more than 1,200 MW by the summer of 2009. Proposed projects adding another 6,500 MW of wind capacity to be developed by 2011 are proceeding through the grid interconnection study process administered by the NYISO.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues