Resources

Search, compare, and request quotes for nearly 13,000 products with detailed listings:

Blogs

  • 2012 IEEE PES Show Blog

    The IEEE Blog is a unique tour of the 2012 PES Expo in Orlando, FL, by Gene Wolf, former chairman of the IEEE PES T&D Committee.

White Papers

» More White Papers

Follow Power Editor Nikki Chandler on

Follow Technology Editor on Vito Longo

Find T&D World on Facebook

News Releases

Briefing Room

At the Briefing Room you will be able to stay up-to-date on the latest technology announcements where we will provide daily postings from our industry sources.

  
   

PECO Reaps Rewards of Diagnostic Maintenance

Oil sampling, SF6 cameras and thermography keep transformers and equipment on-line and delivering power.

Imagine that instead of changing a car's oil every 3000 miles, drops of the oil could be tested to determine when it needed to be changed. This might never be done for cars because the testing is more expensive than just changing the oil. But when it comes to electrical high-voltage substations, it is too expensive not to engage in the predictive and diagnostic maintenance (PdM) that PECO, an electric and natural gas utility subsidiary of Exelon Corp., is using to proactively manage transmission and substation maintenance.

PECO's approach to maintenance drives greater productivity, avoids equipment failures and outages, provides costs savings and supports the utility's environmental goals of preventing oil spills and greenhouse-gas leaks. Work plans directly link the work of maintenance technicians, engineers and planners to the utility's strategies. This approach adds up to operational excellence, which is the ultimate objective.

The Right Maintenance Programs

The alternative to PdM is time-based maintenance, which is much more labor intensive, ineffective at identifying problems that develop between scheduled inspections and not as cost effective.

For utilities, PdM has moved far beyond simply looking at the dipstick, to continue the car analogy. Predictive maintenance technology has drastically changed over the last few years. Substation technicians are using oil sampling, infrared thermography, visual inspections, acoustical monitoring, SF6 gas detection cameras and other practices to proactively manage maintenance to ensure system reliability. Comprehensive data collection and analyses is critical. Technicians collect and evaluate more than 50,000 data points every month.

With predictive maintenance, as it relates to general equipment in the substation and the need to maintain it, data is collected on equipment. The data is then turned into information to identify issues. The issues are taken care of before any components break down. As a result, equipment is maintained before it fails. This approach reduces maintenance costs significantly.

Fixing larger problems requires taking a substation off-line, taking a piece of equipment out of service and rerouting power, or placing operations into contingencies. A transformer may cost several million dollars and take months for a utility to replace. A lot of money and resources are saved if a failure is prevented. Downtime for a power plant due to an outage at its substation can be incredibly costly, too.

In addition to eliminating equipment breakdowns, quickly repairing oil leaks and reducing greenhouse-gas leaks at substations are high priorities. The goal is zero preventable spills while handling the insulating oil, and there are aggressive targets for emission reductions from breaker SF6 releases. Inspectors identify and prioritize leaks, and they are proactively fixed.

Currently, PECO has approximately 15 technicians who perform substation inspections, off-line diagnostics and dissolved gas analysis (DGA) oil sampling on transformers and circuit breakers. They also use infrared thermography to check for heat and cold in the wrong places. Systems often do not have to be taken out of service to be inspected and maintained, saving time and money and — most of all — increasing equipment availability.

Avoiding Failure Outages Saves Millions

As Pennsylvania's largest utility, PECO's system spans southeastern Pennsylvania and serves 1.6 million customers with its 29,000 miles (46,671 km) of distribution and transmission lines. Its 452 substations range from the large power substations connected to generation to small-unit substations that feed residential neighborhoods.

PECO's transmission and substation group maintains approximately 1200 power transformers on the system. They range in age from new to more than 80 years old. The Schuylkill Station in south Philadelphia was constructed in 1926 while General Electric founder and renowned inventor Thomas Edison was still working. But rather than showing an aging fleet, the Schuylkill operation demonstrates the effectiveness of PECO's maintenance program.

Oil analysis is a long-term program that can be more predictive than many other methods. PECO's program is roughly 10 years old. Engineers and technicians keep components and substations humming along while collecting more than 16,000 data points a month from oil sampling alone and roughly 36,000 data points from the Cascade database of equipment records. Cascade is a utility maintenance management system from Digital Inspections, a KEMA company. All told, about 5500 fluid qualities and approximately 4000 DGA samples are taken each year on 1800 pieces of PECO equipment. Oil sampling is done at more than 300 locations, and the infrared camera is used on the largest 138 facilities. The thermography checks heating and cooling on transformers.

Replacing oil in a car is cheap, so it does not make sense to test it. But transformers are expensive pieces of equipment, so PECO relies on the data to tell when it is time to fix the equipment. This PdM approach has proven successful. Over the past decade, PECO's substation transformer failure rate has dropped 50%; its failure rate consistently ranks among the lowest in the industry. Annual savings are estimated at more than US$30 million.

One of the secrets to the success of this plan is to actually insert inspections into technicians' weekly work schedules. The inspections are listed right along with other duties and work tasks as well as training and days off. The technicians take a sample and deliver it to the chemical lab. The sample results are entered into Cascade and analyzed. An alert is sent to the engineers, who write follow-up work orders to handle the situation.

Although this sounds like pretty mundane stuff, in reality, the analysis is actually anything but mundane. Studying the gases dissolved in oil is similar to analyzing a blood sample taken from a medical patient. A syringe of oil is withdrawn and analyzed using a gas chromatograph. Just like a blood test reveals good and bad cholesterol and triglyceride levels to show the health of a patient, the existence of certain gases, including methane, ethane, ethylene and acetylene, may indicate problems such as a partial discharge, overheating or arcing. Just like the optimum blood pressure and cholesterol levels are different for people of different ages and gender, various gas levels can be calculated for various equipment. Other gases such as carbon dioxide may be a sign of overheated insulation. Results are tracked and trends noted in order to identify problems, perform maintenance and maintain system health.

Want to use this article? Click here for options!
© 2012 Penton Media Inc.


Acceptable Use Policy

Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.

General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.

blog comments powered by Disqus

T&D TV

Most Read


Find Other Popular Items

Features

Vegetation Management
Grid Optimization

Upcoming Webcasts

Transmission & Distribution World allows you to access live and on-demand webcasts. Webcasts are available during their scheduled date and time. If you are unable to attend at the scheduled time, these free events will be available On-Demand for viewing at your convenience.


On-Demand Webcasts

» View More Webcasts

Jobzone
  • Transmission & Distribution World May 2012 Issue
  • Transmission & Distribution World April2012 Issue
  • Transmission & Distribution World March 2012 Issue
  • Transmission & Distribution World February 2012 Issue
  • January 2012 Issue
  • December 2011 Issue
  • November 2011 Issue

Browse Back Issues