Powersystem UK Orders S&C DSTATCOM
S&C has received an order from Powersystem UK, in Bristol, for a PureWave DSTATCOM Distributed Static Compensator for the initial phase of the 48-MW Aikengall Wind Project. S&C is a long-standing manufacturer of electric power switching and protection equipment, including the PureWave family of power-quality products. The PureWave DSTATCOM is a part of the electrical equipment order that Powersystem UK received from Cheshire-based Community Wind Ltd., who will construct, own and operate the project. Wind Prospect Ltd. of Bristol is the owners-engineer.
The +22/-14 MVAR inverter-based system, which includes transformers, a switched inductor and switched capacitor banks, will be delivered in the summer of 2008 and placed in service in the fall.
Want to use this article? Click here for options!
© 2012 Penton Media Inc.
Acceptable Use Policy
Comments are the sole responsibility of the person posting them. T&D World will not edit postings. If T&D World editors deem any comment inappropriate, we will preempt or remove the posting.
General Rules: T&D World will not allow comments that are found to be degrading based on gender, race, class, ethnicity, national origin, religion, sexual orientation or disability. Neither will epithets, abusive language or obscene comments be allowed.
blog comments powered by Disqus
















